安钢2000级高炉全焦开炉创新实践(国外英文资料).doc

安钢2000级高炉全焦开炉创新实践(国外英文资料).doc

  1. 1、本文档共28页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
安钢2000级高炉全焦开炉创新实践(国外英文资料)

安钢2000级高炉全焦开炉创新实践(国外英文资料) 2000 steel grade blast furnace coke blowing in innovative practice Xian Zhen Guo 1,2 at Hai Bin 1 Shaodang Valley 1, Shen Feng, full Two (1. Anyang iron and steel Limited by Share Ltd, Anyang 455000; 2. Northeastern University, Shenyang 110004) Through the two seat of Anyang Iron and Steel Group In practice 2000 blast furnace system from a new perspective comprehensive summary of Anyang Steel 2000 blast furnace technology, such as belt Wind loading, bottom ignition, all coke furnace, iron installed in the ventilation pipe, introduced in detail to the blow in process from early in personnel, equipment, raw material and fuel preparation Control, and start-up equipment before and after maintenance work. Keywords blow all coke with wind loading bottom ignition Innovation, Practice, of, Blow-in, with, Full, Coke, in 2000, Level, of, Blast, Furnace, in, Angang Guo, Xianzhen1,2, Yu, Haibin1, Gu, Shaodang1, Shen, Fengman2 (1., Anyang, Iron, and, Steel, Stock, Company, Anyang, 455000, 2., Northeastern, University, Shenyang, 110004) Abstract, This, paper, adopted, practice, of, blast, furnaces, of, two, m3,, level, from,, a, new, angle, summarizes, systemically Technology, of, startup, in, big, blast, with, full, coke, in, Angang, such, as, loading, materials, with, wind, furnace, furnace, bottom Ignition, blow-in, with, full, coke, tap, hole, with, ventilation, tube, installation, detailed, introduces, the, technology,, from, the Furnace, prophase, personnel, equipment, raw, material, and, fuel, to, prepare, for, the, furnace, process, control, and, equipment Maintenance work before blow-in. Key, words, blow-in, with, full, coke, loading, with, wind, bottom, ignition 1 Introduction Anyang iron and steel Limited by Share Ltd has two seats Grade 2000m3 blast furnace, respectively 2005 October 15, 2007 06 month In 28 days, So far, two blast furnaces have experienced a falling surface shutdown and the blow in process. In the process of blow in two blast

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档