操作步骤(国外英文资料).doc

  1. 1、本文档共21页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
操作步骤(国外英文资料)

操作步骤(国外英文资料) Single crystal furnace charging Installation of silicon material A. take the loading of stainless steel car and silicon material, carefully check the contents of the ingredient list is consistent with the single crystal furnace number, material in kind, if abnormal, timely processing and report to the monitor or director. B. change the gloves for charging. If there is a master alloy, put it into the quartz crucible. Then, the small material scrap tile in the pot. C. bulk material is placed with medium material is placed in the center, around the top left and right aniseed to be fixed into a small gap in silicon material. Loading should be careful operation, gently handle, to prevent the collision of quartz crucible, do not drop the material in the gap of the heat preservation cover, so as not to cause fire. Take care not to draw the material out of the quartz crucible during the charging of the D., otherwise it will cause the flow of silicon liquid in the melting process, damage the graphite parts, or even stew the furnace. After the completion of loading of E. open crucible rotation rotation around the gap, confirm, and then quickly reduced to limit the crucible. Stop spinning. F., the upper and upper crucible heater insulation cover upper part and then clean cleaning brush the net absorption of dust and silicon slag. G. installed insulation cap and guide tube in turn. When installing the heat shield, the flow should be identical with each other. When the guide tube is installed, the operation should be carried out carefully. If the silicon material is contacted, the placement of the silicon material shall be adjusted so as to prevent the dip of silicon in the process of material discharge. Specific operation steps of single crystal furnace 1, purpose In order to operate the single crystal furnace correctly and formally, and ensure the normal operation of the production, the specifications are specially made. 2, scope of application Suitable for TDR-70

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档