- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
施工队一般工价参考(国外英文资料)
施工队一般工价参考(国外英文资料)
Construction team general wages reference 2009-09-29 21:53 construction team general wages reference
The construction team around the wages are not the same, even in the same city, from the construction team where its real wages are not the same, it is from the field workers popular, relatively speaking, the team from Guangdong the highest wages, followed by the Jiangsu and Zhejiang area team, the following work price to give you a reference.
Serial number, unit name, reference price description
I. demolition works
1 demolition of steel doors and windows (single and double fan zetoms) 10
2 demolition of steel doors and windows (three or four Tang fan) 15
3 demolition of steel doors and windows (four fan above) Tang 30 high-rise building at 50 yuan from
4 remove wooden door window sash fan 4
5 wooden frame frame 10 demolition
6 remove the 1 brick wall M214.00
7 remove the 1/2 brick wall M26.00
The 8 floor tile, wall tile chisel M29.00 with difficulty separately
9 remove ceiling and ceiling M25.00
10 demolition of galvanized iron pipe M2.00
11 remove the bathtub only 25
12 remove the toilet even the water tank is only 15
13 remove basin only 5
14 demolition bucket 8
15 wall paint M22.50 foundation is difficult to eradicate separately
16 remove flat top paint M24.00
Two building powder engineering
17 new masonry 1 brick wall M215.00
18 new masonry 1/2 brick wall M210.00
19 new masonry 1/4 brick wall M27.00
20 new glass brick wall M216.00
21 new plasterboard wall (double sided) M215.00
22 new powder wall (Fen Guang) M28.00
23 new powder flat topped M210.00
24 leveling floor M26.00
25 masonry pipe root 50
26 floor tile M216.00, including scraped base
27 paving tiles M218.00 including scraped base
28, terrace granite, marble, M230.00
29, granite, marble skirting board, M6.00
Three ceiling project
30 plasterboard hanging flat (flat) M225.00
31 gypsum board hanging plate (height) M230.00 special shape separately
32 plastic gusset plate hanging flat top M21