浅议桩基设计施工及检测中的一些问题(国外英文资料).docVIP

浅议桩基设计施工及检测中的一些问题(国外英文资料).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
浅议桩基设计施工及检测中的一些问题(国外英文资料)

浅议桩基设计施工及检测中的一些问题(国外英文资料) This article is contributed by xraywind Pdf documents may experience poor browsing on the WAP side. It is recommended that you first select TXT, or download the source file to the local view. VIP information Fujian construction technology 20.02NO.3 Discussion on some problems in design, construction and test of pile foundation Liu Hanwei (construction seven Construction Engineering Co., Ltd., 330) Fu 600 [Abstract] combining with the engineering practice, the problems existing in the design, construction and inspection of the pile foundation are discussed [Key words] base; plan; work; test; close the pile; facilities inspection AbtatCoiighrciapoet, smepolmsaothcntutn.dsgndtcinfplfudtoaPsrc:mbnntepatclrjcsorbebuteosrcioeinadeetooionainre Dsuseicsd. Keywods:ionain; dsgrplfudteoein; cntutoosrcin; dtcineeto Because of the rapid development of computer technology and the continuous improvement of CAD software, CAD software has been widely used by engineers in engineering field. Although the use of CAD soft The bearing capacity is often insufficient in South fujian. Through investigation, analysis and preliminary judgment The main reason is that the designer is based on the angle of the bored pile as the end bearing pile The utility model has the advantages of time saving, labor saving, high calculation speed and high calculation accuracy Point, designers solve many manual calculation difficult to solve the problem. Engineering design for... The amount of the pile concrete is saved, and the cross section of the pile body is very small To limit the enlargement, the designers ignore the size effect correction and make the bearing capacity inadequate. The main reason is due to residual cohesive soil by water leaching, but the soil mechanical properties of bubble leaching has undergone great changes, for the expanded construction. Off into soil and soil. This phenomenon often collapse not according to the requirements of the drawings of the fine roo

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档