电缆桥架安装注意事项(国外英文资料).docVIP

电缆桥架安装注意事项(国外英文资料).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
电缆桥架安装注意事项(国外英文资料)

电缆桥架安装注意事项(国外英文资料) Notes on installation of cable tray 1 、 the maximum load of the new alloy plastic cable tray equipment, the support spacing should be less than the allowable load and span. 2, the selection of cable bridge width should have some spare space, in order to add cable for future use. 3, when the power cable and control cable quantity is less, can use unified cable bridge installation, but in the middle to use partition board will Power cables and control cables are separated and laid out. If necessary, a shielded bridge shall be combined with a common bridge. 4 when the cable bridge is horizontally laid, the joints between the bridges shall be located at the 1/4 of the span as far as possible, and the bridge with the horizontal direction shall be located as far as possible Stand at about 2 meters high fixed boom one, the vertical direction of the bridge every 1.5 meters or so fixed one. 5, shield cable bridge installation should be equipped with protective cover, bridge in outdoor installation, the top should also be equipped with protective cover, prevent sun and rain. A device in substation (or power plant) including directly with production and distribution to related equipment for a device: generator transformer, isolating switch, transformer, power capacitor, reactor, busbar, lightning arrester, transmission lines, etc.. H E$a$D (D (n), v4CP3J0, connected by a primary device, is called a primary system. ZG power automation bGUw*t|K^ Two equipment of an electrical equipment for measurement, control, monitoring, control and protection of the auxiliary equipment, including: various relays, signal devices, measuring instruments, control switches, control cables, power supply operation and small bus etc.. A1F VVd0 {[consists of two devices connected into a loop called the two loop. ZG power automation Y7w6`GP+@G The task of the two circuit is to reflect the working state of the primary system, to control the primary system, and to make the accident pa

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档