- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
矿井大范围停电应急救援预案(国外英文资料)
矿井大范围停电应急救援预案(国外英文资料)
Emergency rescue plan for large scale power cut in mine
(1) the power failure treatment measures for the double circuit power supply in the mine (caused by the failure of the power supply system outside the mine); an irresistible power failure accident.
1, the establishment of emergency rescue command.
2 open the explosion-proof door to ensure the natural ventilation of mine.
3, mechanical or electrical or mechanical and electrical a team of related personnel to stop the 110kV substation, responsible for contact.
4. The construction personnel in each mining area will be evacuated to the place where the air pressure is ventilated and where the telephone is located, and the number of people will be collected. Get the withdrawal order, evacuate to the nearest exit (exit to the ground, and the north wind wells wells Dongfeng shaft ladderway).
5, after getting the upper well instruction, orderly go up the well along the safety exit.
6, Dongfeng wells, north wind wells, deputy wellhead count, the number of wells raised. All the units on duty, electricians, local ventilators, drivers, water pump drivers and tile inspectors will be put on standby in their respective units on duty.
Matters needing attention:
1, the underground substation, pumping station on duty personnel received evacuation orders, you can withdraw along the evacuation route to the exit to raise wells. The bottom of the main pumping station duty personnel evacuation orders in receiving the dispatch room, all waterproof gate will lead to the closure of the main pumping station after, then along the road from the auxiliary ladder to evacuate.
2, the power distribution operators, pump drivers before leaving, their respective positions of electrical switches all operate to zero, and atresia.
3, auxiliary cage to wait for rescue.
4 、 the dispatch office ensures that the communication and dispatching system is unblocked and provides accurate monitoring information.
(two) the power failure o
您可能关注的文档
最近下载
- 2025广西公需科目考试答案(3套,涵盖95_试题)一区两地一园一通道建设;人工智能时代的机遇与挑战.pdf VIP
- 2025商用车发动机气缸体铸件技术条件.docx VIP
- 颅内复杂动脉瘤介入治疗围术期护理专家共识2025 .pdf
- 第二节病虫害预测预报教学教材.ppt VIP
- 电梯新检规施工自检报告-曳引客货-2024.doc
- 2025年高考英语(新高考Ⅱ卷)试卷评析及2026高考备考策略 课件.pptx
- 2000年全国高中学生化学竞赛决赛(冬令营)理论试题与实验试题及参考答案精品.pdf VIP
- 苹果公司知识产权保护策略.pptx
- 中药饮片智能调剂与煎煮关键技术研究课件.pdf VIP
- 局部解剖学(山东联盟) 智慧树 知到答案.docx VIP
文档评论(0)