脚手架工程标识要求(国外英文资料).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
脚手架工程标识要求(国外英文资料)

脚手架工程标识要求(国外英文资料) 4.10 scaffold engineering labeling requirements 1, scaffolding erection requirements: specifications, clean, color separation, marking. 2, building set logo card, unified size. 3, scaffolding skirting board suggested the use of two colors. The safety net must meet the requirements of the national fire protection standards and be clean, clean and tight. 4, the construction site at the bottom of the scaffold with flat bottom ramming, pole should use wooden planks or At the same time, the gutter must be provided with convenient drainage. 5 、 site scaffolding erection requirements, height work, construction safety requirements, regulations, warning signs, Scaffold test. 6, the scaffold should be equipped with a certain number of fire extinguishing equipment or equipment. 4.11 Overhanging Scaffold works The bottom of the scaffold should be tightly closed to prevent the steel pipe from dropping and wounding Net, put a template on it. The template shall be neatly sawed and shall be taken care of in the steel rope, steel pipe and other parts Leave space. The sundries on the frame should be cleaned in time. 4.12 steel unloading platform 1, I-beam unloading platform should be installed in accordance with the special program, arrange for special personnel responsible for management, fixed Period examination. 2. The tail end of the unloading platform shall be embedded with fixed round steel bars. The pull ring shall be firmly fixed with wooden sides and unloaded flat The platform should be closed and the whole closed measures should be adopted. 3 the platform shall indicate the allowable use of the load in apparent position. 4.13 site construction shelter 1, reinforcement, woodworking processing shed, mixing station, construction building entrance: double deck protection must be adopted Guards, perimeter seals, ground hardening, safety signs hung at the entrance of the building. 2, pumping machine, mortar mixing field must be set pool and drainage ditch, catch

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档