- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
质检员考试试题 2(国外英文资料)
质检员考试试题 2(国外英文资料)
An engineering laboratory concrete mixture ratio for 1:2.2:4.26, W/C=0.6 per cubic meter of water cement ratio, cement sand ratio is 3% 300KG, including field observation, stone moisture content is 1%, with 250 liters (discharge capacity) stirrer. Trial seeking:
The construction mix ratio of this project is (1:2.27:4.3)
The amount of cement used for each stirring is (75) Kg
The amount of sand for each stirring is (170.3) Kg
The amount of stone used for each stirring is (322.5) Kg
The amount of water used for each stirring is (36.9) Kg
Note: the experimental design of concrete mixture ratio for the cement: Sand: sand gravel =1:X:Y, the measured moisture content is Wx, the stone moisture content is Wy, then the construction mix ratio of 1:X (1+Wx): Y (1+Wy) construction of water cement ratio: W/C =W/C-3%X-1%Y
An expansion plant has 40 independent columns of the same specifications. The design of the outdoor terrace elevation is -0.3m and the design of the base elevation is -2.3m, four slope, slope bottom m=0.5, size 2200*1800, C25 reinforced concrete foundation for each 1.544m3. The initial coefficient of relaxation of the soil is Ks=1.20 and the ultimate coefficient of relaxation is Ks =1.05.
The top can be released (1) m on each side
The middle column pit area (8.96) square meters
The amount of earthwork excavation is (743.47) M3
If the soil volume is recorded in the natural state, the backfill shall be reserved (649.25) M3
Top slope: (2.3-0.3) *0.5=1m
Mouth area: 2.2*1.8=3.96 square meters area is: (2.2+2*1) * (1.8+2*1) =15.96 square meters
The central area: (2.2+4.2) /2* (1.8+3.8) /2=8.96 V =40 *[2/6 dug m (15.96+4*8.96+3.96)]=40* (1/3) *55.76
V fill =V dig -40*1.544
V leave =V and fill in /1.05
The sand ratio of 3 and 1 cubic concrete is 0.54, and the sand rate is 0.35 (sand rate =0.54/ (1+0.54))
4, the sand rate is the ratio of the mass of sand to the sum of the mass of sand and stone
5, dry sand 500g, its screening results are as follows:
Mes
您可能关注的文档
最近下载
- 全套IECQQC080000-2017有害物质过程管理体系文件(HSPM).pdf VIP
- 中国东方资产管理股份有限公司招聘笔试题库2025.pdf
- 市场调查与分析: 数据分析网络调查报告撰写 (慕课版)王晓燕习题答案.docx
- 起重装卸机械操作工高级工培训大纲与教学内容概述.docx VIP
- 2025至2030中国中药饮片行业市场发展现状及竞争格局与投资发展报告.docx
- 2025年教科版六年级上册科学第一单元综合检测试卷及答案.pptx VIP
- 《企业质量管控与应用》课件.ppt VIP
- 吊顶施工合同范本.pdf VIP
- 公共建筑室内温度控制管理办法——空调系统节能运行管理制度.doc VIP
- 统编版八年级语文上册课件《诗词五首-渔家傲》.pptx VIP
文档评论(0)