- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
开工方案(国外英语资料)
开工方案(国外英文资料)
Device operation method
Preparation before commencement
Organize relevant personnel to check and accept all maintenance items of the plant.
1. the workshop shall arrange special persons to remove or install all blind plates according to the blind plate.
2., to fully implement the program and requirements of workers, and process changes.
3. comprehensive cleaning device sanitation.
4. prepare fire fighting equipment and fire the steam belt.
5. clean out the sundries in the furnace, turn off the fire window, the explosion door and the manhole, and install the burner.
6. contact the supply department to receive ammonia water, lubricating oil, demulsifier, and corrosion inhibitor.
7. contact the inspection workshop for quality analysis of lubricating oil, ammonia water and lye, and provide the following analysis results to the workshop:
Lubricants: viscosity, moisture, mechanical impurities.
Ammonia water: concentration.
8. contact inspection workshop to provide crude oil analysis data:
Specific gravity, water content, and en distillation data.
9. contact the plant dispatching room to bring in circulating water, fresh water, electricity, steam and compressed air inlet.
10. install the calibrated pressure gauge and thermometer according to process requirements.
11., the day before the start, each machine, pump, fan tank loaded with lubricating oil.
12. prepare heating furnace ignition rod.
13. prepare demulsifier solution with a concentration of 2%.
14. prepare the post record and shift diary.
3.2 inspection prior to commencement of work
1. tower
1. check tray, receiving tray, draw or return tower line, tower bottom and draw mouth, no sundries.
2. check whether the tray and its fasteners are firm, whether the tray level is qualified or not, whether the float valve is complete and flexible.
3. check the distribution pipe, the steam distribution pipe opening is smooth, the direction is accurate.
4., check the pressure gauge, liquid level gauge pipe is smooth,
您可能关注的文档
最近下载
- 药物设计软件:Discovery Studio二次开发_(3).使用Python进行DiscoveryStudio脚本开发.docx VIP
- 扁桃体切除术手术配合.pptx VIP
- 《人工智能通识基础》全套教学课件.pptx
- 高考冲刺词组搭配汇编(四校用)5.docx VIP
- (3.7)--2.3.1立井开拓采矿学采矿学.pdf VIP
- 新课改理念下小学数学课堂教学反思.doc VIP
- 《铁路调度指挥及控制系统》课件——车站TDCS.pptx VIP
- 《铁路调度指挥及控制系统》课件——铁路局调度所TDCS.pptx VIP
- 量子信息讲座.pdf VIP
- 高考冲刺词组搭配汇编(四校用)4.docx VIP
文档评论(0)