DLT电缆线路施工检验.docx

  1. 1、本文档共33页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
DLT电缆线路施工检验

电缆管配置及敷设Cable pipe configuration and laying工序Process检验项目Check items性质Property质量标准Quality standard检验方法和器具Inspection method and instrument电缆管制作Cable pipe fabrication外观检查appearance inspection 金属管metal pipe内表面Inner surface光滑,无毛刺smooth,no burrs观察检查visual check外表面Outside surface无穿孔、裂缝、显著的凹凸不平及锈蚀no hole,crack,obvious unevenness or rust塑料管plastic pipe敷设温度laying temperature按设计规定as per the design stipulation按图纸检查并检查出厂合格证check as per the drawing and check the factory certificate管材强度pipe strength切断口(管口)nozzle光滑smooth观察检查visual check弯曲部分bending section无裂缝及显著的凹瘪no crack or obvious concavity每根电缆管的弯头数No. of each pipe bending elbows一般弯头common elbow≤3个 not more than 3观察检查visual check直角弯头right angle elbow≤2个 not more than 2弯曲半径bending radius主要primary与所穿电缆弯曲半径匹配suitable for the cable bending radius用样板检查check with the sample电缆管弯扁度cable pipe bending flatness degree不大于1/10电缆管外径not bigger than 1/10 of the cable pipe OD用尺检查check with the tape电缆管检查Cable pipe inspection电缆管内径ID of the cable pipe按设计规定,且不小于1.5倍电缆外径as per design stipulation, and not less than 1.5 times of the cable outside diameter用尺检查check with the tape管内畅通检查non-obstruction check主要primary光滑,无积水,杂物smooth, no seeper or sundries用0.85倍管内径拉线球检查check with the bracing wire ball(0.85 times pipe inside diameter)敷管Pipe laying路径method按设计规定as per design stipulation对照图纸检查check comparing with the drawings明敷exposed laying单管敷设single pipe laying横平竖直horizontal and vertical观察检查visual check排管敷设pipe bundle laying管口高度nozzle elevation一致identical观察检查visual check弯曲弧度bending radian measure观察检查visual check引至设备的管口位置lead to the nozzle of the equipment便于电缆与设备连接,并不妨碍设备拆装和进出convenient to connect the cable and the device, not obstruct the equipment dismounting and passing观察检查visual check与热力管道,热力设备之间的净距the net distance between pipe and the heating pipe, heating equipment平行敷设parallel laying主要primary≥1m,不宜敷设于热力管道上部≥1m, not good to lay above the thermal pipes用尺检查check with the tape交叉敷设cross laying ≥0.5m与保温层之间净距the net distancebetween the pipe and the the

文档评论(0)

jiaoyuguanliji + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档