基于的目工期化Method of project period optimization based on dynamic programming Abstract: Period is an important indicator of a project, how to control and optimize the period of a project with limited resources is also a problem faced by project managers. Now the most commonly used project management methods such as CPM(critical path method), can control the period by calculating the critical path project. When the project critical path length is longer than the expected time of the project, project period optimization is needed, but now we don’t have a convenient and general method to optimize the