- 13
- 0
- 约2.69万字
- 约 14页
- 2017-06-17 发布于新疆
- 举报
A Bridge For All CenturiesAn extremely long-and record setting-main span was designed for the second bridge to across the Panama Canal in order to meet the owner’s requirement that no piers be placed in the water.Because no disruption of canal traffic was permitted at any time,the cable-stayed bridge of cast-in-place cancrete was carefully constructed using the balanced-cantilever method.In 1962 ,the Bridge of Americas(Puente de las America) opened to traffic,serving as the only fixed link across the Panama Canal .The bridge was designed to carry 60,000 vehicles per day on four lanes, but it has beenoperating above its capacity for many years.Toalleviate bottlenecks on the route that the bridge carries over the canal-the Pan-American Highway(Inter-American Highway)-and promotegrowth on the western side of Panama,the country’s Ministry of Public Works(Ministerio de ObrasPublicas,or MOP )decided to build a new highway systerm linking the northern part of Panama City,on the eastern side of the canal, to the town of Arraijan,located on the western side of the canal.The Centennial Bridge –named to commemorate 100 years of Panamanian independence-has noe been constructed and, when opend, will carry six lanes of traffic. This cable-stayed bridge of cast-in-place cancrete features a main span of 420m,the longest such span for this type of bridge in the Western Hemisphere.In 200 the MOP invited international bridge design firms to compete for the design of the crossing, requesting a two-package proposal:onetechinical, the other financial. A total of eight proposals were received by December 2000 from established bridge design firms all over the world. After short-listing three firms on the basis of the technical merits of their proposals, the MOP selected T.Y.Lin International, of San Francisco, to prepare the bridge design and provide field construction support based on the firm’s financial package.The Centennial Bridge desige process was unique and aggressive,incorporating
您可能关注的文档
- 8-2 简支梁布局-外文资料翻译.docx
- 10kv无功补偿-外文翻译.docx
- 21世纪的税制改革-外文翻译.docx
- AT89C51 单片机-毕业论文外文翻译.docx
- AT89C51的概况-外文翻译.docx
- Android起航-外文翻译.docx
- C# 编程语言概述-外文文献翻译.docx
- AT89C51的介绍-外文文献翻译.docx
- C#及数据库的开发-外文文献翻译.docx
- EDA技术及软件-外文文献翻译.docx
- 小区绿化施工协议书.docx
- 墙面施工协议书.docx
- 1 古诗二首(课件)--2025-2026学年统编版语文二年级下册.pptx
- (2026春新版)部编版八年级道德与法治下册《3.1《公民基本权利》PPT课件.pptx
- (2026春新版)部编版八年级道德与法治下册《4.3《依法履行义务》PPT课件.pptx
- (2026春新版)部编版八年级道德与法治下册《6.2《按劳分配为主体、多种分配方式并存》PPT课件.pptx
- (2026春新版)部编版八年级道德与法治下册《6.1《公有制为主体、多种所有制经济共同发展》PPT课件.pptx
- 初三教学管理交流发言稿.docx
- 小学生课外阅读总结.docx
- 餐饮门店夜经济运营的社会责任报告(夜间贡献)撰写流程试题库及答案.doc
原创力文档

文档评论(0)