循环水开车(国外英文资料).doc

  1. 1、本文档共21页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
循环水开车(国外英文资料)

循环水开车(国外英文资料) The circulating water system stops and drives after a long period of parking 7.1.1 driving conditions 1) the drug system and the filter system have been repaired. 2) cooling water tower fan, circulating water pump, valve, circulating water technology pipeline and heat exchanger have been repaired. Power supply, the instrument power supply is equipped with electric power. The instrument has been adjusted. Chemical cleaning agent, prediaphragm, corrosion inhibitor and fungicide have been delivered to the scene. 6) the sink and the sink have been swept clean. The clean water plant has been driving normally and can provide qualified and sufficient circulating water to replenish water. 7.1.2 drivers 7.1.2.1 hydraulic flushing of circulating water system 1) close the drain valve of the sink and the sink, and water the sink, the water turbidity is less than 5ppm, and the total Fe is less than 3mg/l (in Fe). 2) open the cooling water tower bypass valve and circulating pump circulation valve and close the blow-off valve. 3) when circulating water suction tank liquid level to high level (overflow), according to the program start circulating pump P - 06001 - b, establish circulating water, adjust the circulating valve of the circulating water pump, to adjust the water flow is not lower than 8000 m3 / h, ensure flushing velocity in 2-3 m/s (pay attention to the circulating water pipe network high exhaust pump after). 4) in the process of circulation, analyze every 4 hours a circulating water turbidity and total Fe, when turbidity is greater than 20 parts per million, total Fe is greater than 5 mg/l, maximum filling water and sewage. 5) the circulating water pipe is well developed when the total Fe is less than 5mg/l when flushing is less than 5mg/l. 6) open the valve on the tower, bypass valve closed cooling tower, let the rinse water tower packing, until the rinse water turbidity stable rise, no longer flush end packing. Stop the circulation pump. 7) drain water

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档