- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
技术要求一般模板(国外英文资料)
技术要求一般模板(国外英文资料)
To summarize, there are approximately the basic technical requirements of the following areas for reference (specific figures, specific terms and conditions determined by the designer according to the actual situation) :
General technical requirements:
The parts remove the oxidized skin.
On the surface of the parts, there should not be any defects in the surface of the parts, such as scratches and bruises.
Remove the burrs.
Heat treatment requirements:
Through the processing of the adjustment, HRC50 ~ 55.
Parts of high frequency quenching, 350 ~ 370 ℃ tempering, HRC40 ~ 45.
The carburizing depth 0.3 mm.
Conduct the high temperature aging process.
Tolerance requirements:
The non-shape tolerance should meet the requirement of GB1184-80.
The unfilled length size allows the deviation to be plus or minus 0.5 mm.
The casting tolerance band is symmetrical in the basic size of the blank casting.
Part angles:
No rounded radius R5.
Did not note chamfer are 2 x 45 °.
Acute blunt.
Assemble requirements:
The sealing parts must be soaked before assembly.
Assembly of hot charging rolling bearings allow used engine oil heating, oil temperature shall not exceed 100 ℃.
After the gear box is assembled, the design and procedure shall be carried out in an empty load test. No shock, noise, temperature rise and leakage shall be allowed to exceed the relevant standards.
After gear assembly, the contact spots and sides of the tooth surface should meet the requirements of GB10095 and GB11365.
When assembling hydraulic systems, the sealing filler or sealant shall be used, but should be prevented from entering the system.
The assembly parts and parts (including the foreign purchase and foreign products) shall be assembled by the certification of the inspection department.
Parts must be cleaned and cleaned before assembly, no burrs, flying edges, oxidized skin, rust, cuttings, grease, stain, dust etc.
Before assembly, the main coordination size of the parts, especially the size
您可能关注的文档
最近下载
- 《稻渔共生模式中生态系统稳定性与农业生态环境保护政策执行效果评估监督》教学研究课题报告.docx
- 2015款广汽传祺GS4_汽车使用手册用户操作图解驾驶指南车主车辆说明书电子版.pdf
- 汽车销售礼仪培训课件.ppt VIP
- 关于印发《关于推动中央企业加快司库体系建设进一步加强资金管理的意见》的通知.docx VIP
- 大学生心理健康教育(第3版)PPT完整全套教学课件.pptx VIP
- 区域地理东亚和日本课程教学设计.pdf VIP
- 锂电池负极粘结剂行业发展现状及市场需求规模分析.docx VIP
- 数学分析第5章.ppt VIP
- 中国锂电池负极粘结剂项目经营分析报告.docx VIP
- 中国共产党基层组织选举工作条例知识测试及答案.docx VIP
文档评论(0)