- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
公务员申论(国外英语资料)
公务员申论(国外英语资料)
Civil servants Shanghai.Txt
Ten on the 2011 hot issues in the national civil service exam
2011 civil servants on the hot spots: the potential problems exposed behind the rain
[background to social issues] since May 5, 2010, a wave of rare storms has hit southern China, flooding everywhere. From the beginning of May 12th, Hunan, Guangxi, Jiangxi, Guangdong and other provinces in two months have suffered more than 10 strong rainfall, some serious waterlogging in the city, the city of Guangzhou in half a month, two times the water.
Rain continuous so many city frequently float, exposed the current in some parts of the city to speed up modernization, excessive pursuit of cement hardening, a series of noticeable underground heavy ground light, light-weight construction planning and other issues.
[potential problems behind rainstorm]
[potential problems]
Waterlogging caused serious root or the city is too fragile, in the extreme weather background, the existing drainage facilities can not withstand the flood in the city waterlogging pace. In recent years, there has been underground heavy ground light, light-weight construction planning and other issues, in a beautiful and modern edifice below, the drainage system is almost a blank, encounter extreme weather is often not a rival. Urban development brought about by the ground cement hard, but also to drainage plugging, so that the urban drainage system overwhelmed, it can be described as worse.
[potential problems (I) - solutions]
(1) strengthen the management and maintenance of urban drainage system. In addition to strengthening the management and maintenance of urban drainage systems, urban managers can not sacrifice parks, green spaces and water bodies because of urban development, and emphasize green urbanization. Cui Shenghui proposed to speed up the existing urban green roof, and effectively retain part of the rain, but also further greening the city.
(2) the urban construction departments and the meteo
文档评论(0)