系统升级计划(国外英语资料).docVIP

  1. 1、本文档共29页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
系统升级计划(国外英语资料)

系统升级计划(国外英语资料) The backup system upgrade implementation plan Beijing polystor Co. Ltd. December 21, 2006 document property Attribute content Final customer name: The name of the customer Project name: Project number: The main document title: the backup system installation plan Document subtitle: Document number: Version date: 2006-12-21 Document status: Text Catalog 1 polystor responsibility 5 2 project organization and management 6 Project implementation process control 6 Management during the project 8 Preparation and management of documents and archives 8 Phased project progress summary 8 Related work system 9 Organization structure of project implementation 11 Schedule of implementation of the project 14 Project installation process description 18 Prepare 18 before installation Install hardware and software 19 After installation 23 Project acceptance phase 24 According to the system status and development, the general staff decided to upgrade the backup system, namely VERITAS NetBackup software. The backup system has played an important role in the operation of normal, it will improve the implementation of business operation can play an important role. In order to ensure the success of the project, Beijing polystor Co. Ltd. to develop this the backup system upgrade implementation plan. 1 polystor responsibility Beijing polystor Co. Ltd. (hereinafter referred to as polystor) take VERITAS NetBackup backup software at the backup system in the project implementation work. Unless specifically stated, the items referred to in this document refer to the upgrade implementation of the VERITAS NetBackup backup software. Polystor does not undertake the software and hardware of non polystor in this project provides the configuration of responsibility, the work is not within the scope of work of the implementation of the project. Polystor company will complete the following work: Work with project personnel to implement planning and implement detailed analysis; Cooperate wit

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档