高压灌浆(国外英语资料).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
高压灌浆(国外英语资料)

高压灌浆(国外英语资料) I. basis for compilation 1, the project site investigation of the specific situation: found subway tunnel wall leakage, water; 2. Technical specification for engineering waterproof GB50108-2001; 3. Code for acceptance of waterproof works GB50208-2002; 4, the relevant provisions of the current state regulations. Two 、 construction principle and method Adopt high pressure grouting to block water treatment. 1, determine the waterproof scheme: must conduct on-site investigation before plugging, to find out the site construction conditions, analysis of the causes of seepage Water Leakage, identify Water Leakage parts, crack, crack or perforation of the width, length, depth and penetration, and to understand the situation Water Leakage sunny and rainy days, the Water Leakage measurement of flow and velocity and so on, through the full investigation the correct formulation, sealing solutions, do the preparatory work. 2. material properties: oily polyurethane rapid plugging glue and water reaction, because the water in the reaction, the slurry can not be diluted with water washed away, this is the advantage that other filling materials do not possess the slurry under pressure, pouring concrete cracks or holes, at the same time to penetrate the gap around, continue to penetrate into the concrete cracks, finally the formation of network structure, a low density, elastic body water, has a good ability to adapt to change, good waterproof. 3, the design of grouting hole and hole hole hole filling and a slant hole two forms to choose according to the actual situation and needs, and both when necessary. (1) the design of grouting hole: the location of grouting hole should make the hole intersect with the water leakage, cracks and voids, and select the maximum water leakage. (2) hole principle: the position and number of grouting holes, reasonably arranged according to the different situation of | Water Leakage examination |, to derive Water Leakage for the purpose, i

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档