2007年一级建造师市政实务真题及答案(国外英语资料)

2007年一级建造师市政实务真题及答案 2007 exam First, individual choice questions A total of 20 questions, 1 points each. Each item options, only 1 of the most to do) 1., the urban road pavement structure is often composed of multi-level, of which the main load-bearing role is (C). A. top layer B., bottom layer, C. base, D. cushion 2. rigid retaining walls move under the action of external force to fill the earth, so that the soil behind the wall is extruded upwards, and the horizontal pressure acting on the wall is called (C). A. horizontal thrust; B.; active earth pressure; C.; passive earth pressure; D.; static earth pressure The waste temperature of 3.EVA and PE polymer modified asphalt mixture is (D). A.165, B.175, C.185, D.195 4. the method of determining the optimum asphalt content of recycled asphalt mixture is (A). A. Marshall test, B. penetration test, C. ductility test, D. boiling test method 5. during the period of cofferdam use, the normal water level of the river is +2.0m, and the highest water level (including wave height) is +3.0m, and the minimum elevation of the cofferdam shall be (C). A.+2.5m B.+3.0m C.+3.5m D.+4.0m 6. municipal public works, concrete mix design should go through four steps, in which the construction mix ratio design stage to mix ratio adjustment, and put forward the construction mix ratio is based on (A). A. measured the relation between the water content of sand and gravel, the strength of B. and the design strength C. construction conditions, variations and possible fluctuations of material quality, D. strength verification principle and density correction method In the construction of 7. post tensioned prestressed concrete, the grouting of the prestressing tendon should be carried out in time, and the following is wrong about the pore pressure grouting statement (B). A. when the temperature is higher than 35 in the daytime, the grouting should be done at night After 24 hours of B. grouting, the temperature of the structural concrete can be low

文档评论(0)

1亿VIP精品文档

相关文档