2007年一级建造师市政实务真题及答案(国外英语资料)
2007年一级建造师市政实务真题及答案
2007 exam
First, individual choice questions
A total of 20 questions, 1 points each. Each item options, only 1 of the most to do)
1., the urban road pavement structure is often composed of multi-level, of which the main load-bearing role is (C).
A. top layer B., bottom layer, C. base, D. cushion
2. rigid retaining walls move under the action of external force to fill the earth, so that the soil behind the wall is extruded upwards, and the horizontal pressure acting on the wall is called (C).
A. horizontal thrust; B.; active earth pressure; C.; passive earth pressure; D.; static earth pressure
The waste temperature of 3.EVA and PE polymer modified asphalt mixture is (D).
A.165, B.175, C.185, D.195
4. the method of determining the optimum asphalt content of recycled asphalt mixture is (A).
A. Marshall test, B. penetration test, C. ductility test, D. boiling test method
5. during the period of cofferdam use, the normal water level of the river is +2.0m, and the highest water level (including wave height) is +3.0m, and the minimum elevation of the cofferdam shall be (C).
A.+2.5m B.+3.0m C.+3.5m D.+4.0m
6. municipal public works, concrete mix design should go through four steps, in which the construction mix ratio design stage to mix ratio adjustment, and put forward the construction mix ratio is based on (A).
A. measured the relation between the water content of sand and gravel, the strength of B. and the design strength
C. construction conditions, variations and possible fluctuations of material quality, D. strength verification principle and density correction method
In the construction of 7. post tensioned prestressed concrete, the grouting of the prestressing tendon should be carried out in time, and the following is wrong about the pore pressure grouting statement (B).
A. when the temperature is higher than 35 in the daytime, the grouting should be done at night
After 24 hours of B. grouting, the temperature of the structural concrete can be low
您可能关注的文档
- (锅盖子)升级破解方法(国外英语资料).doc
- (考试时间:70分钟 试卷满分:70分 考试形式:开卷)(国外英语资料).doc
- (大一必读)写给即将踏入大一的同学,如何度过我的大学(国外英语资料).doc
- (持续添加修正)各地名店名厨多款流行火锅蘸料、味碟配方经典总汇(麻酱、沙茶、海鲜、香辣、肥牛等)(国外英语资料).doc
- (一)申请入本人递交入党申请书(国外英语资料).doc
- (强力推荐)大规模的海水运动(二)洋流对地理环境的影响(国外英语资料).doc
- (设计)工作细则 - 上海工程技术大学 继续教育学院(国外英语资料).doc
- (问答和操作题)(国外英语资料).doc
- 001探究题(黄冈市物理中考题调考题汇编)(国外英语资料).doc
- 01_NEW YORK SENATE RACE SPEECH(国外英语资料).doc
最近下载
- 2024年青海省中考语文试卷.doc VIP
- MLflow:MLflow模型版本控制教程.docx
- 症状严重程度每日记录量表的引进及信效度检验.doc VIP
- 英语专业四级考试阅读分析.ppt VIP
- 2025年拍卖师绿色拍卖与可持续发展理念在企业中的推行专题试卷及解析.pdf VIP
- 2025年金融风险管理师环境衍生品与碳交易市场专题试卷及解析.pdf VIP
- 面向文化遗产保护的AI伦理治理框架.pdf VIP
- 人教版高中化学选择性必修3全册教学课件.pptx
- 2025年信息系统安全专家物理渗透测试技术专题试卷及解析.pdf VIP
- 埃及风荷载设计规范EGYPT_Chapter-7-Wind-Loads-Egyptian-Load-Code.pdf VIP
原创力文档

文档评论(0)