网站大量收购独家精品文档,联系QQ:2885784924

2010年造价工程师考试《工程造价案例分析》摸底评测(一)(国外英语资料).doc

2010年造价工程师考试《工程造价案例分析》摸底评测(一)(国外英语资料).doc

  1. 1、本文档共18页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
2010年造价工程师考试《工程造价案例分析》摸底评测(一)(国外英语资料)

2010年造价工程师考试《工程造价案例分析》摸底评测(一) In 2010, cost engineer examination project cost case analysis thoroughly evaluate (1) I. brief answer () 1, an enterprise intends to build an industrial production project. Data on construction cost settlement of similar projects of the same industry in the same industry are shown in table 1.1. Table 1.1. Construction cost settlement data of similar projects have been built In Table 1.1, A production workshop of the imported equipment purchase fee of 164 million 300 thousand yuan, the domestic equipment costs; imported equipment purchase costs, equipment price (FOB) l for $2 million ($1 =8.3 yuan), the domestic freight and other ancillary costs. Question: 1., the construction cost of similar projects, including labor costs, material costs, mechanical and comprehensive taxes and fees, the proportion of construction costs accounted for 13.5%, 61.7%, 9.3%, 15.5%. Due to the construction of time and place, different standards, the price adjustment of the corresponding coefficients were 1.36, 1.28, L.23, L.18; Affiliated engineering project in the construction and similar projects affiliated engineering quantity is reduced by 20% compared with the rest of the project content unchanged. Try to calculate the comprehensive variance coefficient of the construction cost and the total construction cost of the proposed project. 2., try to calculate the proportion of imported equipment, other subsidiary costs and domestic freight and miscellaneous fees, accounting for the purchase fees of imported equipment. 3. the project main production equipment of the A production workshop still imported equipment, but the equipment price (FOB) for $11 million ($1 =7.2 yuan); other ancillary costs of imported equipment and domestic transport fees according to the construction of similar project corresponding proportion unchanged: supporting domestic procurement of equipment purchase costs by 25% comprehensive. A equipment production workshop outside the other ma

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档