asefjvsal;fjd施工组织设计(国外英语资料).docVIP

  • 2
  • 0
  • 约2.37万字
  • 约 7页
  • 2017-06-24 发布于河南
  • 举报

asefjvsal;fjd施工组织设计(国外英语资料).doc

asefjvsal;fjd施工组织设计(国外英语资料)

asefjvsal;fjd施工组织设计 1, soil according to the degree of difficulty of excavation is divided into eight categories. 2. Bulldozers are suitable for site cleaning, earthwork leveling, excavation with little excavation depth, and backfill operation, etc.. 3, filling compaction methods generally have rolling, compaction, vibration compaction. 4, the production of precast piles, concrete pouring from the pile top to pile tip continuous casting, tamping, completed once, after the completion of the maintenance time of not less than 7 days. 5, pile stacking layer shall not exceed four layers. 6, mud wall protection refers to the use of mud to protect the hole wall, to prevent collapse and discharge soil slag to form a pile hole. 7, scaffolding from the wall 1500mm. 8, the 31 brick, namely a brick, a shovel ash, crush, and building method of the extruded mortar scrape. 9, mortar fullness degree, gray seam not less than 80% 10, the joint for horse tooth trough and a tie bar. 11, Chaimo beam span is greater than 8m standard value of concrete strength is greater than 100% 12 、 flash butt welding is used for steel bar lengthening. Electroslag pressure welding is used in vertical direction. 13 、 concrete mixer discharge capacity are: 5015025035050070010001500 and 3000 14, construction joints should be left in the structure of force (shear) smaller and easy to continue construction site. 15, for Portland cement, natural conservation shall not be less than 7 days and nights. 16, concrete must be maintained until the strength of more than 1.2MPa, only on the pedestrian and assumed stent. 17 when prestressed tendons are stretched, the strength of concrete shall not be less than 75% of the standard value of design strength 18, column installation process, including lashing, lifting, in place, temporary fixed, correction, and finally fixed procedures. 19, the column correction is perpendicularity. 20, intermediate plastering with 2m feet, allowed deviation shall not be greater than 4mm.

文档评论(0)

1亿VIP精品文档

相关文档