- 1、本文档共19页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
土建常用数据(国外英语资料)
土建常用数据
I. The amount of concrete used in ordinary residential buildings and the amount of steel used:
1, multi story masonry house:
Reinforcement: 30KG/m2
Concrete: 0.3 ~ 0.33m3/m2
2, multi layer frame:
Reinforcement: 38 ~ 42KG/m2
Concrete: 0.33 ~ 0.35m3/m2
3, small high-level 11~12:
Reinforcement: 50 ~ 52KG/m2
Concrete: 0.35m3/m2
4, 17~18 floors:
Reinforcement: 54 ~ 60KG/m2
Concrete: 0.36m3/m2
5, 30 meters high, H=94 meters:
Reinforcement: 65 ~ 75KG/m2
Concrete: 0.42 ~ 0.47m3/m2
6, high-rise hotel style apartment 28 H=90 meters:
Reinforcement: 65 ~ 70KG/m2
Concrete: 0.38 ~ 0.42m3/m2
7 villa: the amount of concrete and the amount of steel between multi-storey masonry residential and high-rise 11~12 layers;
The above data are designed according to the seismic 7 degree zone rule
Two, ordinary multi-storey residential building construction budget economic indicators
1, outdoor doors and windows (excluding units, doors, security doors) area of 0.20 to 0.24 of the construction area
2, the template area accounts for about 2.2 of the floor area
3, the outdoor plastering area accounts for about 0.4 of the floor area
4, indoor plastering area accounted for 3.8 of the floor area
Three, construction efficiency
1, a plastering worker, plastering 35 square meters a day
2, a brick, 1000~1800 bricks a day
3, a brick, 800~1000 bricks a day hollow bricks
4, ceramic tile 15 square metre
5, scraping the first 300 square meters / day, second times 180 square meters / day, third times the pressure of 90 square meters / day
Four. Basic data
1 、 concrete weight 2500KG/m3
2, the weight per meter of reinforced 0.00617 * D * D
3, dry sand weight 1500KG/m3, wet sand weight 1700KG/m3
4, stone weight 2200KG/m3
5, one cubic meter of red brick about 525 pieces (wall thickness)
6, one cubic meter of hollow brick about 175
7, sieve one side clean sand, 1.3 square ordinary sand
Construction program song
Want to build effect is good, choose a team to want invite public bidding.
After winning the cont
您可能关注的文档
- 单元1.11%20楼宇及楼面(国外英语资料).doc
- 单元综合测试八(人类与地理环境的协调发展)(国外英语资料).doc
- 单元测试二(国外英语资料).doc
- 单副扑克牌升级规则(国外英语资料).doc
- 单反入门(国外英语资料).doc
- 单刀会(国外英语资料).doc
- 单张纸胶印机输纸十字谈(国外英语资料).doc
- 单摆复摆的差别(国外英语资料).doc
- 单片机原理及接口技术课后习题答答(国外英语资料).doc
- 华夫饼的做法(国外英语资料).doc
- GB/T 45632-2025数字航空摄影测量 控制测量规范.pdf
- GB/T 45616.4-2025自动化系统与集成 面向制造的数字孪生框架 第4部分:信息交换.pdf
- 中国国家标准 GB/T 45616.4-2025自动化系统与集成 面向制造的数字孪生框架 第4部分:信息交换.pdf
- 《GB/T 45616.4-2025自动化系统与集成 面向制造的数字孪生框架 第4部分:信息交换》.pdf
- GB/T 33588.1-2025雷电防护系统部件(LPSC) 第1部分:连接件的要求.pdf
- 中国国家标准 GB/T 33588.1-2025雷电防护系统部件(LPSC) 第1部分:连接件的要求.pdf
- 《GB/T 33588.1-2025雷电防护系统部件(LPSC) 第1部分:连接件的要求》.pdf
- 《GB/T 33588.3-2025雷电防护系统部件(LPSC) 第3部分:隔离放电间隙(ISGs)的要求》.pdf
- 中国国家标准 GB/T 33588.3-2025雷电防护系统部件(LPSC) 第3部分:隔离放电间隙(ISGs)的要求.pdf
- GB/T 18757-2025企业建模与体系结构 企业参考体系结构与方法论的要求.pdf
文档评论(0)