网站大量收购独家精品文档,联系QQ:2885784924

工程项目融资案例(国外英语资料).doc

  1. 1、本文档共8页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
工程项目融资案例(国外英语资料)

工程项目融资案例 1, the financing background of power plants Hengyuan Power Co. Ltd. in the predecessor to the exergy group was founded in 1977 the Hengyuan power plant. One thousand nine hundred and ninety-six In October, the approval by the Municipal Peoples government for the restructuring of Hengyuan Power Group Co. Ltd. the injection Book capital is 285 million yuan. The group has jurisdiction over power plants, self owned power plants, cement plants and aluminium Companies such as 14 wholly-owned subsidiaries and holding the existing total assets of 1 billion 700 million yuan in the form of electricity As the leading force in coal, building materials, nonferrous metals and processing, electronic appliances such as one, Large state-owned enterprise groups with distinctive industrial chain characteristics and advantages. Among them, a power plant and its own Preparation of power plant total installed capacity of 256 thousand kilowatts of the private coal mine with an annual output of 450 thousand tons of raw coal in the aluminum plant The production capacity of 30 thousand tons of fly ash cement plant annual production scale of 300 thousand tons. In addition to the aluminum processing The plant and aluminum silicon titanium multi alloy project is scheduled to be put into operation in 1999. In 1998 the group achieved The sales income of 550 million yuan 110 million yuan in profits and taxes in the city where the highest budget in Enterprises Strong economic strength. Hengyuan power plant in 1995 to the State Planning Commission submitted a proposed 2 x 300 MW power plant The power plant project proposal and in the same year to. In September 5, 1997 8, the power. Planning and Design Institute of the feasibility study for the supplemental review and issued a supplementary feasibility report Review opinions. Hengyuan power in the proposal the project plans a total investment of 3 billion 822 million 610 thousand yuan. The capital including Chinese and foreigners in exergy

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档