- 1、本文档共4页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
施工放线步调(国外英语资料)
施工放线步骤
Construction release procedure
The construction line operation line is generally divided into various methods; Longmen plate positioning ruler line and instrument measurement line, according to the former control point or field drawings known to determine, based on on line outside of the building around a certain distance piling, the erection of Longmen plate, a pull to the right angled line construction line in Longmen plate, try to put the line taut, then by using the Pythagorean theorem by the ruler and ruler, the size should be larger, generally 6, 8, 10m, this is more accurate, the first in two control line size measured with a red pencil point, then two people pull the feet, a swing can the thread and steel tape dimensional stability, and then fixed the construction line of Longmen plate, with a steel ruler proofreading again, after confirmation, surrounded by hanging wire, steel check, according to the drawings on the axis dimension with ruler measuring point, use The plumb line is vertical to the ground so that it can be removed with lime powder. The level is measured on the Longmen board with a level meter.
1, the general case is embedded steel in the internal position of pre selected, find the intersection, on the plate with a theodolite notch, as the vertical axis of the measuring point, then use a large hammer line how to hang more convenient. With the point of the line hammer pointing to the axis, notify the personnel on the floor using the intercom when the line hammer is aiming at the reference point. In the alignment below the hammer, the hammer tip point to plate and point difference observed from two perpendicular directions, and notify the upstairs staff timely adjustment of the position of the steel wire, when the hammer tip and cross direction from both sides are coincident, can inform the upper point.
As for the problem of elastic steel wire does exist, the key is to put the steel wire strand round on the floor to specially, can small h
文档评论(0)