网站大量收购独家精品文档,联系QQ:2885784924

聚羧酸系减水剂在南水北调工程中的应用(国外英语资料).doc

聚羧酸系减水剂在南水北调工程中的应用(国外英语资料).doc

  1. 1、本文档共10页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
聚羧酸系减水剂在南水北调工程中的应用(国外英语资料)

聚羧酸系减水剂在南水北调工程中的应用 The middle route of the south to North Water Transfer Project is an important infrastructure project to optimize the allocation of water resources and solve the water shortage in the north of China. It plays a strategic role in realizing the sustainable development of the northern region. The project is 1273.4km, China is following the Yangtze River Three Gorges Project after another large water conservancy project, project of large scale, complex geological conditions, the structure of building complex, the new pumping stations, channels, large aqueduct, inverted siphon concrete building engineering more than 1000. The huge volume of concrete, concrete technical requirements for different kinds of buildings, concrete strength grade, from C10 to C60 the lowest layer of concrete, prestressed concrete PCCP pipeline project, from normal concrete to the pump, self compacting concrete, these technical requirements need different types and varieties of additives, in order to meet the needs of design and construction the. Therefore, how to select and apply the admixture reasonably, improve the durability of concrete and guarantee the construction quality of the project will directly affect the safe operation and service life of the middle route project. This paper briefly introduces the application of polycarboxylate superplasticizer in the PCCP project of the middle route of South to North Water Diversion Project, and provides reference and reference for similar projects. PCCP pipeline engineering 1. project brief introduction: the Beijing section of the Middle Route Project of the south to North Water Transfer Project has a total length of 80.4km, of which the total length of the PCCP project is 56.359km, and the double row DN4000 prestressed steel cylinder concrete pipe (PCCP) is used for carrying water. The maximum working pressure of the pipeline design is 0.8MPa, the maximum design soil depth is 10m, and the core concrete strength design grade is

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档