质保体系(国外英语资料).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
质保体系(国外英语资料)

质保体系 First, quality standards and quality assurance measures of quality assurance system is to ensure and improve the quality of the project as the goal, with strict organization and scientific management system of the business system, the various departments and enterprises and the link quality management organization, the formation of a clear mandate, organic whole specific responsibilities and the corresponding authority, coordination, promote each other, so that the quality management system. Check and hold a project quality summary and analysis meeting. (3) the project manager will organize the quality inspection of the project department once every quarter, and each construction team will check the construction quality every day and select the quality grade. (5) the construction team adhere to the three system, self qualified, full-time inspectors to conduct a comprehensive inspection and acceptance. Then by the inspector or the builder please sign acceptance of supervision engineer. (6) found in violation of the construction procedure, not according to the design drawings, specifications and codes for the construction, use of raw materials, finished products and does not meet the quality requirements of the equipment, have the right to stop at all levels of management personnel, if necessary, to suspend the construction of put forward rectification suggestions to the supervisor. (7) the monthly report to the project manager for the project quality report, quality analysis, establish and perfect all kinds of engineering quality records, collect all kinds of engineering quality data. 4, construction operation quality assurance, construction operator, is the direct responsibility of the quality of the project. The quality of the project. In addition to the design reasons, the quality of the process alone, the construction operator is the key, is the decisive factor. Construction operators must have the appropriate operating skills, especially in key parts of th

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档