- 1、本文档共7页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
钢筋工程量计算规则(国外英语资料)
钢筋工程量计算规则
The rules of steel engineering calculation.Txt if I am poor enough to leave a bowl of rice, I will let you eat first, all the best things in the world should be mine, including you!! Can I say first love die? Come on, listen. Have the ability to take care of yourself, or honestly let me take care of you! This article is contributed by jdxyks
DOC documents may experience poor browsing on the WAP side. It is recommended that you first select TXT, or download the source file to the local view.
Rules for calculation of reinforced engineering quantities (1) calculation rules for reinforcing steel quantities 1, reinforcing steel works should be distinguished from cast in place, prefabricated parts, different steel grades and specifications, multiplied by unit weight by design length, and calculated in tons. 2, the reinforcement quantity calculation, the design has been specified steel tower is connected to the length of the tower is connected in accordance with the provisions of length; design not specified tower connection length, has been included in the reinforcement of the loss rate, not the other tower connection length calculation. Reinforcement, electroslag pressure welding, sleeve extrusion and so on, in order to calculate. 3, pre tensioned prestressed reinforcement length is calculated according to the shape and the size of the component, post tensioned reinforced by prestressed reinforcement design provisions of the reserved channel length, and the difference between different types of anchorage, were calculated according to the following provisions: (1) low alloy steel with both ends of the screw anchor, prestressed steel bar according to the reserved hole length by 0.35m, the screw shall be calculated separately. (2) one end of the low alloy steel bar is inserted with an end plug, and the length of the prestressed steel bar is calculated according to the reserved hole length at the other end of the screw anchor, and the screw is calculated separatel
您可能关注的文档
- 装完XP操作系统后必须做的10件大事(强力推荐)(国外英语资料).doc
- 西南交《自动化制造系统》在线作业二(国外英语资料).doc
- 西城区高一语文必修2单元测试一(国外英语资料).doc
- 西塘论文(国外英语资料).doc
- 西方人眼中的马克思(国外英语资料).doc
- 西方修建(国外英语资料).doc
- 西伯利亚的理发师-评(国外英语资料).doc
- 西方管理学实体调查(国外英语资料).doc
- 西方音乐总体风格变迁(毕明辉)(国外英语资料).doc
- 西安的五星级酒店及中国各城市的五星级酒店数目(国外英语资料).doc
- 难点详解鲁教版(五四制)6年级数学下册期末测试卷带答案详解(考试直接用).docx
- 难点详解鲁教版(五四制)6年级数学下册期末试题【培优】附答案详解.docx
- 难点解析鲁教版(五四制)7年级数学下册期末试题及完整答案详解(全国通用).docx
- 难点解析鲁教版(五四制)7年级数学下册期末试题含完整答案详解(名师系列).docx
- 难点解析鲁教版(五四制)7年级数学下册期末试题含完整答案详解【全国通用】.docx
- 难点解析鲁教版(五四制)7年级数学下册期末试卷(突破训练)附答案详解.docx
- 难点解析鲁教版(五四制)7年级数学下册期末试卷(能力提升)附答案详解.docx
- 难点详解京改版数学9年级上册期中试卷附参考答案详解【突破训练】.docx
- 难点解析鲁教版(五四制)7年级数学下册期末试题含完整答案详解(有一套).docx
- 难点解析鲁教版(五四制)7年级数学下册期末试卷带答案详解(夺分金卷).docx
最近下载
- 2025年中国抗CD20单株抗体项目创业计划书.docx
- 5.2《做自强不息的中国人》 课件-2024-2025学年统编版道德与法治七年级下册.pptx VIP
- 2025年初中地理中考跨学科专题练习附答案.docx VIP
- 天然气场站设备-题库.doc VIP
- 做自强不息的中国人 课件- 2024-2025学年统编版道德与法治七年级下册.pptx VIP
- 高速公路养护风险源辨识表.docx
- 2025年内蒙古时事政治考试试卷带解析AB卷.docx VIP
- 2025上海中学生时政大赛备考题复习试题附答案.doc
- 《GB 43500-2023安全管理体系要求》解读与培训.pptx
- 天然气场站设备拆除施工方案.doc
文档评论(0)