- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
防雷、接地施工工艺(国外英语资料)
防雷、接地施工工艺
(1) overview
Civil engineering lightning fortification is divided into three stages, the roof generally use 25 x 4 hot galvanized flat steel as lightning belt along the parapet around the laying of 25 x 4 hot galvanized flat steel lightning belt clip support spacing of 1 meters, but must be consistent, at the corner of the hanging segment is not more than 1 meters high, with lightning out of the house decoration or parapet 0.15 meters, while the roof adopted 25 * 4 hot galvanized flat steel components ranging from lightning grid. The lightning protection grid is laid along the roof, and all the metal components above the roof shall be welded with the lightning conductor.
At present, the general civil construction structure using the column or shear wall in the main reinforcement as the lead line, connected steel welding, diameter greater than 16 mm two as a group, at the top of the pillars embedded 100 * 100 * 8 steel, used to convert the main pillars of reinforcement and lightning protection belt connection.
The form of grounding is mainly man-made grounding body and using foundation as grounding form. The equipotential grounding network is made up of the steel net of the cap and the connection of the steel bar of the pile foundation, and the grounding resistance is no more than 1 ohms.
Each layer of building exterior wall continuous beam reinforced with welded steel floor form equalizing ring, and reliable line is connected with the lead, on the wall of metal doors and windows, metal structure, exterior wall railing and equalizing ring is connected to prevent thunder.
In recent years, equipotential bonding has become more and more strict, mainly including total equipotential bonding, auxiliary equipotential bonding and local equipotential bonding. Room, toilet equipment, metal pipelines and other common equipotential grounding.
(2) construction process
Construction preparation: earthing device installation, lead line installation, lightning protection t