基于盾构法的Istanbul地铁施工引起的地面沉降预测 Surface settlement predictions for Istanbul Metro tunnelsexcavated by EP.doc
- 1、本文档共25页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
外文原文
Surface settlement predictions for Istanbul Metro tunnels
excavated by EPB-TBM
S. G. Ercelebi ? H. Copur ? I. Ocak
Abstract In this study, short-term surface settlements are predicted for twin tunnels, which are to be excavated in the chainage of 0 ? 850 to 0 ? 900 m between the Esenler and Kirazl? stations of the Istanbul Metro line, which is 4 km in length. The total length of the excavation line is 21.2 km between Esenler and Basaksehir. Tunnels are excavated by employing two earth pressure balance (EPB) tunnel boring machines (TBMs) that have twin tubes of 6.5 m diameter and with 14 m distance from center to center. The TBM in the right tube follows about 100 m behind the other tube. Segmental lining of 1.4 m length is currently employed as the final support. Settlement predictions are performed with finite element method by using Plaxis finite element program. Excavation, ground support and face support steps in FEM analyses are simulated as applied in the field. Predictions are performed for a typical
geological zone, which is considered as critical in terms of surface settlement. Geology in the study area is composed of fill, very stiff clay, dense sand, very dense sand and hard clay, respectively, starting from the surface. In addition to finite element modeling, the surface settlements are also predicted by using semi-theoretical (semi-empirical) and analytical methods. The results indicate that the FE model predicts well the short-term surface settlements for a given volume loss value. The results of semi-theoretical and analytical methods are found to be in good agreement with the FE model. The results of predictions are compared and verified by field measurements. It is suggested that grouting of the excavation void should be performed as fast as possible after excavation of a section as a precaution against surface settlements during excavation. Face pressure of the TBMs should be closely monitored and adjusted for different zones.
Keywords Surface
您可能关注的文档
- 基于网上购物系统的设计与实现.doc
- 基于节能减排的电力系统优化调度研究.doc
- 基于虚交点的圆锥体端面尺寸数显量具的研制.doc
- 基于组态软件的罐区监控系统设计.doc
- 基于蓝牙技术的数据传输系统的设计 The design of the data transmission system based on bluetooth technology.doc
- 基于虚交点的圆锥孔端面尺寸数显测量装置设计与实现.doc
- 基于网络的交互式评阅与写作系统的设计与实现.doc
- 基于虚拟仪器的课程设计.doc
- 基于虚拟仪器技术的煤矿安全监控系统.doc
- 基于西门子S7-200的PLC四层电梯电气控制设计.doc
- 走向人地协调可持续发展课件人教版(2019)高中地理.pptx
- Unit9LearningLesson1GrammarFocus课件高中英语北师大版(2019).pptx
- Unit3SportsandFitnessReadingforWriting课件高中英语人教版(2019).pptx
- 高考英语创新译林版学案模块五Unit1.doc
- 2025年广东省四校高三语文5月模拟联考试卷附答案解析.docx
- 2025年广东省四校高三语文5月模拟联考试卷附答案解析.pdf
- 六年级下册道德与法治期末检测卷附答案(夺分金卷).docx
- 北师大版一年级上册数学期中测试卷附参考答案【典型题】.docx
- _蔬香酥烤鸭_与普通焖炉烤鸭营养成分的研究.pdf
- 苏锡常镇化学(三十三).DOCX
文档评论(0)