网站大量收购独家精品文档,联系QQ:2885784924

208硬母线安装施工工艺(国外英语资料).doc

  1. 1、本文档共17页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
208硬母线安装施工工艺(国外英语资料)

208硬母线安装施工工艺(国外英语资料) 1 scope This technology standard is suitable for the following moment type bus installation in 10kV. 3 operation process 3.1 process flow: The installation of the line measuring, the mounting of the brackets and the tightening device, the installation of the insulator, the processing of the bus, the connection of the bus line The bus line is installed as well as the bus line painting brush oil to check the electricity 3.2 line measurements: After entering the scene, according to the different condition of the bus and the lining of the frame, the check is consistent with the drawing. 3.2.2 alignment measurements: check the length along the bus bar installation direction without obstacles, to building structures or equipment pipeline crossover phenomenon, such as ventilation installation components. 3.2.3 distribution cabinet to install the bus to measure the safety distance of other parts of the equipment. Measuring the size and the size of the frame of each section, and the distance of the brackets and the position of the fixed parts. The installation of 3.3 brackets and tensioning equipment The 3.3.1 bus holder is made of 50x 50x5 Angle steel. The expansion bolts are fixed to the wall (figure 2-37). The 3.3.2 bus tightening device is assembled in the attached drawings (figure 2-38). 3.4 insulator installation: Before the installation of an insulator, the insulation must be waved, and the resistance value of the insulation will be greater than 1 megaohm. Check the appearance of the insulator for the non-crack, the defect, the bolts of the insulator and the nut is strong and the back can be used. Pressure test should be done before the installation of the 6 ~ 10kV pillar insulator. Figure 2-37 Figure 2-38 The 3.4.2 insulator is cushioned by an asbestos pad. The specification of the 3.4.3 insulator plywood and card board should be adjusted to the specification of the bus line. The installation of insulator plywood and card board is firm. 3.5 bus p

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档