- 1、本文档共15页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Build municipal notes二建市政笔记(国外英语资料)
Build municipal notes二建市政笔记(国外英语资料)
1: the construction organization design by the project manager to organize the formulation of, technical director is responsible for the examination and approval by the enterprise, and fill in the form, sign the official seal and signed by general supervision engineer agreed to after implementation.
Refers to the blue prints.the design engineering all contractors (the construction unit, supervision unit and construction unit) after I receive my design construction drawing design documents, familiar with drawings to conduct a comprehensive and detailed, review the problems existing in the construction drawing and unreasonable situation and submit design institute for processing is an important activity. The construction unit shall be responsible for organizing and recording the drawings. Through can make all the contractors, especially the blue prints.the design construction design drawings, familiar with understand design intent, master the engineering features and difficulties, find the need to solve technical problems and proposed solutions, which would be eliminated due to design flaws and problems existing in the prior to construction.
Design changes, construction supervision, supervision, check the scene, report the owner by the owner to inform design units, design units and supervision, design the design change notice, issued by supervision change instruction, the construction unit construction organization design modification, and the examination and approval of alteration.
Special plan: project manager group of professional and technical personnel, technology and professional and technical personnel supervision engineer department, after qualified by the enterprise technical director and general supervision engineer sign after implementation. The experts argument must be made and the review report should be revised according to the written conclusion of the expert group. When the modification is large, the expert argument
您可能关注的文档
- (转)美国人教你这样用Google,你真的会变特工~~~()(国外英语资料).doc
- (medical) the point of knowledge of the TXT ().((医学)断层解剖TXT版知识要点())(国外英语资料).doc
- (下末)五年级语文期末试卷((bottom) fifth grade Chinese final examination paper)(国外英语资料).doc
- (关节脱位、脊柱骨折)((joint dislocation, spinal fracture))(国外英语资料).doc
- - Oracle backup and recovery and use the problem set () in the Oracle9i process.(- Oracle备份与恢学习并使用Oracle9i过程中的问题集())(国外英语资料).doc
- 05-2-1. What kind of future can the Chinese wang reduce(05-2-1.汉王降价,能降出个怎样的未来)(国外英语资料).doc
- 03-3-5. Cloud computing makes the future full of imagination(03-3-5.云计算让企业未来充满想象)(国外英语资料).doc
- 02-hub (HUB)(02-HUB(集线器))(国外英语资料).doc
- 09防火墙(国外英语资料).doc
- 1-5年的积累背诵(国外英语资料).doc
- 【安全经验分享】镇江新区金科·祥生悦园建设工地宿舍“3·8”较大火灾事故 1根香烟,7条人命!6人追刑!.pptx
- 面向类集成测试序列生成问题的深度强化学习方法研究.pdf
- 包含电热氢多元储能的综合能源系统能量管理策略研究.pdf
- H公司食品机生产项目工时管理优化研究.pdf
- 上覆充水型溶洞对巷道围岩稳定性的影响及控制技术研究.pdf
- 松散层底部黏土层渗透破坏试验及数值模拟研究.pdf
- 凉水井煤矿薄煤层大跨度开切眼空顶距与支护技术研究.pdf
- 基于功能可用性的家用制氧机造型设计研究.pdf
- 基于原子力显微镜技术的神经细胞药物刺激响应研究.pdf
- 电力电子变换器直流母线电容状态在线监测方法研究.pdf
文档评论(0)