水泥混凝土路面面层施工工艺(国外英语资料).doc

水泥混凝土路面面层施工工艺(国外英语资料).doc

  1. 1、本文档共19页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
水泥混凝土路面面层施工工艺(国外英语资料)

水泥混凝土路面面层施工工艺(国外英语资料) Construction technology of cement concrete pavement Source: China bidding web date: [2006-9-1] Construction technology of concrete slabs for the installation to install templates, dowel bar, concrete mixing and transportation, concrete paving and vibrating, surface finishing, joint treatment, concrete curing and caulking. 1, install the template The template is suitable for use of steel stencils, curves and other non-standard parts, as well as small projects. Template should have no damage, have enough strength, medial and top and bottom surface should be smooth, level off, suitable straight, local deformation shall not be greater than 3 mm, when vibrating template transverse maximum deflection should be less than 4 mm, height should be consistent with the concrete pavement slab thickness, error is not more than plus or minus 2 mm, longitudinal seam template flat seam eye rod perforation should be accurate, tongue-and-groove seam is the enterprise department of breath or groove length error was plus or minus 1 mm steel template, wooden template plus or minus 2 mm. Set up a pass as a lever When the profile is installed, it is installed in the position of the transmission pole. When the concrete slab is poured continuously, it can use the reinforced support method. Namely garden reserved hole on the sealing board, so that the dowel bar through the sealing plate above the wooden or iron pressure cracks batten, dowel bar according to the location and spacing, inverted u-shaped groove at the bottom of the seam template make it, make the dowel bar resulting by the ends of the dowel bar fixed on the bracket, bracket foot in grassroots. When the concrete slab is not continuously poured, it can be used as a stick by means of the top block. At the end of the template of the lateral increase a positioning template, board according to the pass for pole spacing and stem diameter, drilling, the dowel bar through the end of the template hole, and until the la

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档