监理 继续教育20130527(国外英语资料).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
监理 继续教育20130527(国外英语资料)

监理 继续教国外英语资料) Problem 1 (2) GB 50369-50369 long oil and gas pipeline engineering construction and acceptance standard regulation, with cable trench buried pipelines installation, the minimum clearance (refers to two section of vertical projection interval) should not be less than (B). A. 0, 2 m B. 0, 3 m C. 0, 4 m D. 0, 5 m Problem 2 (2) GB 50369-50369 long oil and gas pipeline engineering construction and acceptance standard regulation, the end of the pipeline pressure testing, pigging with hygroscopic agent, dry mixture of pipe ends after discharge, methanol, glycol content of hygroscopic agent quality percentage is greater than (C) for qualified. A. 60% B. 70% 80% C. D. 90% Problem 3 (2) GB 50235-50235 industrial metal pipeline engineering construction and acceptance standard regulation, the tube cutting, the pipe surface should be smooth, no cracks, double skin, burrs, protruding sunken, shrinkage, slag, oxide, iron filings, etc. The skew deviation should not be greater than the diameter of the pipe (B), and must not exceed 3mm. A. 0.5% B. 1% 1.5% C. D. 2% Problem 4 (2) GB 50369-50369 long oil and gas pipeline engineering construction and acceptance standard gas pipeline detection rules, all of the welded joint should be 100% of the full circumference (D). A. liquid penetration detection B. Tensile strength test Full test Nondestructive testing Problem 5 (2) SH/T 3532-3532 code for construction and acceptance of the petroleum and chemical heat exchange equipment, pressure test should be done when the heat exchange equipment, must be approved by the (B) the safety technical measures, and safety supervision in the process of pressure testing. A. the head of construction unit technology B. the chief technology officer of the construction unit C. supervisor of the unit of supervision D. construction unit project manager Problem 6 (2) GB 50169-50169 electric device installation and acceptance specification for construction of grounding device of lightning r

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档