长钢9#高炉喷煤系统的优化(外国英文资料).docVIP

长钢9#高炉喷煤系统的优化(外国英文资料).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
长钢9#高炉喷煤系统的优化(外国英文资料)

长钢9#高炉喷煤系统的优化(国外英文资料) In recent years, the blast furnace coal injection technology increasingly perfect, medium-speed grinding powder system USES a bag short flow process, blowing system using dense phase conveying technology and safety injection high volatilization of bituminous coal has become the first selection of coal injection system design [1] [2]. Combined with our old coal injection system of production experience, we have 9 # blast furnace coal injection system has been optimized, namely: the medium-speed grinding powder, a bag gun powder, two common grinding machine an induced draft fan and a blast furnace hot blast stove of flue gas as dry gas, using their own developed high-performance mixer, special filters for dense phase conveying coal injection, high-performance Y distributor and two guns for anthracite and bituminous coal mix injection coal injection technology. Nine days in 9 # blast furnace operation, utilization coefficient of 2.6 t/(m3. D) above, coal injection ratio, 170 kg/t, hours of coal injection quantity 23.5 t, as soon as possible after new coal injection system for blast furnace production reaches producing DaXiao provides a strong guarantee. List of technical indicators during blast furnace blast furnace The date utilization coefficient is compared to the fuel ratio of the coal to the fuel ratio and the wind pressure of the wind Optimization of the powder system ChangGang 1080 m3 blast furnace coal injection system is both a new 9 # blast furnace of supporting system, also need to be at the same time meet the needs of the 8 # blast furnace coal injection (formerly indirect injection), at 100% of the total injection coal design, current local meager-lean coal injection 70% + 70% long-flame coal injection coal (ChangGang component analysis (see table 2), coal injection design capacity of coal - 200 kg/t (blast furnace utilization coefficient 3.0). It is composed of coal system, powder system and blowout system, and the process flow char

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档