2011《施工管理》备考习题11-18(国外英文资料).doc

2011《施工管理》备考习题11-18(国外英文资料).doc

  1. 1、本文档共21页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
2011《施工管理》备考习题11-18(国外英文资料)

2011《施工管理》备考习题11-18(国外英文资料) In 2011, two construction division construction management examination exercises selected questions (11) A contractor has obtained the construction general contracting task of a construction project through bidding, and has signed a general contract according to the construction contract (model text) (GF - 99 - 0201). A contractor will subcontract the construction services of the main structural works to the labor subcontracting company, and sign the labor subcontracting contract according to the sub contract (model text) of construction project construction (GF - 2003 - 0214). In the general contract, the responsibilities and obligations of the parties to the contract are stipulated, and the valuation method of the contract is the unit price contract. During construction, the following two events occurred. Events l:2008 April 5th, supervision engineers in checking the quality of roof waterproof engineering construction, affecting the normal construction, the test result is not qualified. Complete event 2:5 15 days after the construction of the roof, there are doubts about the roof gutter somewhere in the waterproof engineering quality supervision engineer, re inspection requirements of stripping. A contractor has peeled off as required and the inspection result is up to standard. In the construction process, a contractor according to the contract implementation of the deviation analysis, adopted the adjustment work plan and adjust the work flow and other measures to correct the contract deviation, according to the plan completed construction task. Answer the following questions according to the background (twelve). 61. for the incident 1, the impact of normal construction, the losses caused by (). A. a contractor B. Supervision Engineer C. owners D. supervision engineer or owner 62. for event 2, the following statements about the contractual liability are correct (). A. the owner shall bear all the additional contract prices arising ther

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档