- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
全面的IE工业工程师工作内容(IE工作执掌)(国外英文资料)
全面的IE工业工程师工作内容(IE工作执掌)
IE responsibilities / responsibilities of Industrial Engineer
1. standard time setting
2. production process formulation
3. production performance evaluation and tracking
4. planning the production line, making the production line configuration drawing
5. teach the foreman and operator to perform assembly or test actions
6. make MPI (work instruction)
7. human production requirements table, table, table accessories and other tools, for tool room, Wuguan preparation and receive the basis of factory
8., according to the requirements to ME requirements and ideas, requirements design, fixture, and follow the control, fixture on-line
9. issue the MN according to the engineering change order (ECO), inform and direct the production line to take necessary actions to meet the requirements of engineering change
10. issue MN to inform the units concerned to follow certain special requirements or to correct incorrect actions
11. inspect the tools, instruments, equipment and personnel on the production site, and make immediate corrections if any of them do not meet the requirements
12. plan and provide the production equipment that should be produced in the production line and improve
13. keep abreast of production equipment, and require FE /FM /PE to do everything possible to maintain the production facilities in serviceable condition
14., improve methods, reduce working hours, make production more smoothly
15. drive cost reduction action (COST, DOWN)
16. dispute between production and quality control
17. plant layout design and Implementation
18. production line and QC personnel training
19. provide the data required for the application for import approval
20. participate in the evaluation of the partners
21. lead sample machine, provide operation
22. assist in sourcing second sources
23. act as communication bridge between business and factory
24. lead the future production technology in the plant
25. estimates of demand for expendable materials and eva
原创力文档


文档评论(0)