- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
建设工程造价管理(2013年版)修改(国外英文资料)
建设工程造价管理(2013年版)修改
Construction cost management
(2013 Edition)
Modify
This textbook combines the Ministry of housing, urban and rural construction and the Ministry of finance, construction and installation costs, project composition (construction standard [2013])
No. 44) Ministry of housing and urban construction, construction project contracting and contract pricing management measures (Ministry of construction, sixteenth order),
The construction project quantity list valuation standard GB50500 - 2013, as well as the discipline development situation, has made the partial revision
A number of typographical errors and correct. The original teaching material has not been corrected. Please refer to the following table for amendment.
The original location of revising and editing staff list second line from the bottom
Xu Yuanming, Chongqing University, write fourth chapters
Xu Yuanming Chongqing University prepared the fourth chapter, the sixth chapter.
First chapters
The second page and first line (two) characteristics of engineering valuation are changed to (two) engineering valuation characteristics
Second page, figure 1.1.1, 1.1.1, modify see P4
Second page, figure 1.1.1, the next 3 lines (2), the estimated cost is changed to (2) project budget
Second page, figure 1.1.1, the first 7 lines (3) revised the estimated cost to (3) amend the budget estimate
Second page, figure 1.1.1, the next 10 lines (4), the budget cost is changed to (4) construction drawing budget
Figure 1.1.1 control second page No. 12 ~ thirteenth before one phase of the project cost. Not every project must determine the budget cost. At present, some projects need to determine bidding control
Price to limit the highest tender offer.
Revised as previous stage project cost control.. At present, according to the current engineering quantity list valuation standard, some engineering projects need to determine the bidding control price to limit the highest bidding price.
Second page figure 1.1.1 the first
您可能关注的文档
最近下载
- (2025秋新版)苏教版科学三年级上册《3单元 地球上的水体》教案.pdf VIP
- 2013款北京现代胜达_汽车使用手册用户操作图解驾驶车主车辆说明书电子版.pdf
- 煤矿建设项目竣工验收报告.docx
- 2022年钢筋工程量计算例题 .pdf VIP
- 6个百分百七个到位.docx VIP
- 初中现代文阅读记叙文散文答题技巧.pptx VIP
- 数学(中考总复习)第六章第27课时《尺规作图》复习课件.pptx
- hse检查表范本.doc VIP
- GBT709—2019热轧钢板和钢带的尺寸、外形、重量及允许偏差.docx VIP
- 4.1文物中的乘法口诀 (课件) 2025-2026学年北师大版数学二年级上册.pptx VIP
原创力文档


文档评论(0)