暖通空调-常见设计知识及问题点汇总(国外英文资料).docVIP

暖通空调-常见设计知识及问题点汇总(国外英文资料).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
暖通空调-常见设计知识及问题点汇总(国外英文资料)

暖通空调-常见设计知识及问题点汇总 (1) system design issues 1, pump in the system design position: In general, chilled water pump water chiller should be located in the front, back from the end of the chilled water through the chilled water pump to water chiller; cooling water pump in the cooling water into the water from the cooling unit, cooling water pump cooling tower out of the back to the unit; hot water circulating pump in the return water pipe, hot water after come back from the end hot water circulating pump to heat exchanger. 2. Valve design on cooling tower: 2, 1 cooling tower inlet pipe with solenoid valve (do not advocate the use of manual valve) 2, 2 pipe drain valve should be installed in the room, (if placed outside, because the pipe has some water storage, winter easily frozen) 3 、 installation position of electronic water treatment instrument Place it behind the pump, in front of the main engine. 4. Valve before and after filter Filter front and rear pressure gauge. 5 、 valve before and after water pump 5, 1 pump inlet pipe in turn: butterfly valve - pressure gauge - soft connection 5, 2 pump pipe outlet in turn: soft - pressure meter - check valve - butterfly valve 6, diversity water Between 6 and 1 water tanks, an electric pressure differential bypass valve and a bypass pipe (usually DN50) are used A thermometer shall be provided on the return pipe of the 6 and 2 water collecting devices 7, all kinds of instrument layout position: thermometer, pressure gauge and other instruments should be in place for observation, the general height of valve from 1.21.5m, above this height, should set up a working platform. 8, the unit position between two compressors projection distance less than 1.0m, between the refrigerator and the wall of the main channel and non distance distance not less than 0.8m, the large and medium-sized refrigeration unit (centrifugal, screw, absorption refrigeration machine) the distance is 1.52.0m. The upper part of the refrigerating machine room o

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档