- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
2012市政增值服务1(国外英文)
2012市政增值服务1(国外英文资料)
National level construction division qualification examination guidance (2012 Edition)
Municipal public works review questions set
Online value-added services (1) 2012
Comprehensive test questions (1)
First, individual choice questions. A total of 20 questions, 1 points each. Each item options, only one of the most to do)
1. Before the subgrade compaction is carried out, the test section shall be used in order to obtain technical parameters related to Subgrade or subbase construction. The following construction parameters that do not belong to such parameters are ().
A, subgrade pre settlement value B, compaction times C, suitable soil type D, compaction method
2, with regard to the nature of grassroots materials, the following statements are correct: ().
A, lime soil and cement soil have good plate properties, and can be used as the base of high-grade pavement
B and lime soil compared with cement soil: water stability, frost resistance is poor, crack resistance is stronger
The strength of C and two ash stabilized soil, strength of plate, water stability and frost resistance are better than those of lime soil, which can be used as the base of high-grade pavement
D and two ash stabilized macadam have high strength, small shrinkage and strong board, which can be used as the base of high-grade pavement
3, when the ground water level of subgrade construction site is higher and over wet, it is necessary to take measures to reduce the subgrade.
A, deep cement mixing pile, B and geotextile
C, plastic plate drainage, D and surcharge preloading method
4, the use of mechanical methods of straightening steel bars, strict control of cold drawn rate to ensure the performance of steel, of which, HPB235, HRB400 steel cold drawn rate is ().
A, 1%, 2%, B, 2%, 1%, C, 1%, 3%, D, 2%, 3%
5, prestressed tension is the key process of bridge construction, the following statement is correct: ().
A and stress control method, stress control must conform to the design and
您可能关注的文档
- (建筑工程)第1、3章(国外英文).doc
- --------地图编号----------(国外英文).doc
- 0-模拟电子技术基础课绪论(国外英文).doc
- 005机械回填土施工工艺(国外英文).doc
- .bash_profile文件的作用(国外英文).doc
- 05直流电动机电力拖动(国外英文).doc
- 06 工程费用的监理(国外英文).doc
- 07公考申论热点问题标本模式:户籍制度改革(国外英文).doc
- 07数学与应用数学 参考答案(A卷)(外国英语).doc
- 095征求意见稿(国外英文).doc
- 养老评估师中级行为面试题库及案例分析.docx
- 面试培训督导时考察其课程理解能力的题目.docx
- 税务专员面试中关于增值税政策的常见问题解答.docx
- 2025宁波市医疗保障局局属事业单位宁波市医疗保障基金管理中心招聘事业编制工作人员1人备考试题附答案.docx
- 2025咸宁市汉口银行咸宁嘉鱼支行招聘笔试历年题库附答案解析.docx
- 2025北京人才发展战略研究院招录笔试备考题库附答案.docx
- 2025四川成都市龙泉驿区青台山中学校秋季教师招聘22人笔试试题附答案解析.docx
- 2025台州市银龄讲学计划教师招募13人笔试参考试题附答案解析.docx
- 2025中国铁建公开招聘42人笔试题库附答案.docx
- 2025中智咨询研究院社会招聘笔试参考题库附答案.docx
原创力文档


文档评论(0)