SBR沥青改性剂123(外国英语资料).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
SBR沥青改性剂123(外国英语资料)

SBR沥青改性剂123Waterproof design index test of bridge deck1. introductionWith the cause of the rapid and the improvement of road grade, highway overpass and viaducts increasing, affect the performance of the negative moment region of reinforced concrete slab and reinforced concrete beams subjected to repeated load of vehicle vibration and impact, tensile and shearing, and climate caused by changes in temperature, expansion, contraction, often have fine cracks caused by floor seepage or Water Leakage. Cause corrosion of reinforcing steel and influence the durability of bridge. Especially in the joint of cast-in-place concrete, although a variety of anti cracking measures have been taken in the design and construction, there are always weak links and cracks. If the waterproof treatment is not taken, the useful life of the bridge will be reduced. In order to prolong the service life of the bridge and reduce the cost of maintenance, it is necessary to spray a waterproof coating on the cement concrete bridge deck to form a waterproof membrane to achieve the purpose of waterproof the bridge surface. GB (5002-96) highway asphalt pavement design code and line mark JT014-97 highway asphalt pavement construction and acceptance norms in the cement concrete bridge deck pavement are required to set up waterproof layer.Zhang Long expressway is the highway of 319 National Highway from Zhangzhou to Longyan, with a total length of 117.2 kilometers, of which three kilometers of Longyan section is 13.2 kilometers. The viaduct accounts for 40% of the total length of the line, with a total length of 3.8 km. The maximum longitudinal gradient of the viaduct is 4.7%, the maximum transverse slope is 7%, the maximum height of the pier is 81 meters, the maximum span is 155 meters, and the upper part of the bridge is composed of continuous rigid frame, prestressed T beam and hollow slab beam. Composite structure of bridge deck pavement with cement concrete and asphalt concrete, steel fiber reinfor

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档