《**市建设工程施工工艺标准指导手册》 ;;第八章 建筑电气安装工程; 电气工程强制性条文 GB 50303-2002 ;第一节 成套配电柜、控制柜(屏、台)和动力、照明配电箱(盘)安装工艺标准;接地(PE)或接零(PEN)支线必须单独与接地(PE)或接零(PEN)干线相连接,不得串联连接。 (强制性条文3.1.7) ;第一节 成套配电柜、控制柜(屏、台)和动力、照明配电箱(盘)安装工艺标准;Evaluation only. Created with Aspose.Slides for .NET 3.5 Client Profile 5.2.0.0. Copyright 2004-2011 Aspose Pty Ltd.;第一节 成套配电柜、控制柜(屏、台)和动力、照明配电箱(盘)安装工艺标准;Evaluation only. Created with Aspose.Slides for .NET 3.5 Client Profile 5.2.0.0. Copyright 2004-2011 Aspose Pty Ltd.;Evaluation only. Created with Aspose.Slides for .NET 3.5 Client Profile 5.2.0.0. Copyright 2004-2011 Aspose Pty Ltd.;Evaluation only. Created with Aspose.Slides for .NET 3.5 Client Profile 5.2.0.0. Copyright 2004-2011 Aspose Pty Ltd.;Evaluation only. Created with Aspose.Slides for .NET 3.5 Client Profile 5.2.0.0. Copyright 2004-2011 Aspose Pty Ltd.;Evaluation only. Created with Aspose.Slides for .NET 3.5 Client Profile 5.2.0.0. Copyright 2004-2011 Aspose Pty Ltd.;Evaluation only. Created with Aspose.Slides for .NET 3.5 Client Profile 5.2.0.0. Copyright 2004-2011 Aspose Pty Ltd.;Evaluation only. Created with Aspose.Slides for .NET 3.5 Client Profile 5.2.0.0. Copyright 2004-2011 Aspose Pty Ltd.;Evaluation only. Created with Aspose.Slides for .NET 3.5 Client Profile 5.2.0.0. Copyright 2004-2011 Aspose Pty Ltd.;单元总配电箱(电表箱)、配电箱通病: 进线处缺接地干线扁钢或总电位接线端子箱 进线处PE或PEN线未重复接地(总等电位联结) 进线处总断路器未按设计要求设漏电保护装置(防火用一般300~500mA ,漏电开关出线后PEN线不能重复接地、零线应经漏电开关进出) 接地线偏小(6.1.2),箱体未接地,带电器的箱门缺跨接地线(铜编织带) 电源线分色分相不正确(同一建筑物电线绝缘层颜色选择应一致,即A-黄 B-绿 C-红 N-淡蓝 PE-黄绿双色线) 各开关进出线截面不一致或偏小 动力设备箱缺地线、零线汇流排,地线串接 配电箱缺回路标识;照明配电箱(住户配电箱)通病: 配电箱内总开关出线截面偏小,开关和导线截面不匹配,擅改开关规格型号、导线截面; 单相三线(穿管)载流量约为: BV16mm2 52A 10kW BV10mm2 38A 8kW BV 6mm2 28A 5kW BV 4mm2 22A 4kW

文档评论(0)

1亿VIP精品文档

相关文档