13040-PI0604-010 丙烯腈项目二级计划报批-译文.doc

13040-PI0604-010 丙烯腈项目二级计划报批-译文.doc

  1. 1、本文档共64页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
13040-PI0604-010 丙烯腈项目二级计划报批-译文

Work Liaison Sheet To: Jiangsu Sierbang Petrochemical Co., Ltd. Fr: Wison Engineering (China) Co., Ltd. project department of Jiangsu Sierbang Petrochemical Acrylonitrile project department Cc: Jiangsu Sierbang Petrochemical Co., Ltd. Acrylonitrile Division、Commerce Department、Product Department 、Electrical Center.、 Instrument Center Subject: Schedule – Level II of Acrylonitrile project department for Approval Description: Sierbang Petrochemical alcohol Quito cogeneration project acrylonitrile project (contains AN / SAR /MMA device) Schedule – Level II discuss with the owners of each department, and abutment ,has completed the adjustment and modification of acrylonitrile project Schedule – Level II, Please give a reply! Attach:1.acrylonitrile project Schedule – Level II illustration 2.Sierbang Petrochemical alcohol Quito cogeneration project acrylonitrile project (contains AN / SAR /MMA device) Schedule – Level II The two stage plan of Acrylonitrile project 一、Project overview Sierbang Petrochemical alcohol Quito cogeneration project acrylonitrile project contains 260000 tons / year AN equipment, 210000 tons / year SAR equipment, 80000 tons / year MMA device. The AN device and SAR device by Sinopec Ningbo Engineering Limited company to undertake design, AN device using Dupont patented technology package, SAR device using Chemetics patented technology; MMA device by Jilin Design Institute of China Petroleum Group Northeast Refining Chemical Engineering Limited company to undertake the design work, use the patent technology of VEKAMAF company. The project by Wison Engineering (China) Co., Ltd. for Em+PC main contractor (including import equipment procurement by the owners). 二、Planning basis 1、General contract project 1, Jiangsu Petrochemical Company Limited Sierbang alcohol based productive projects; 2、AN device, SAR device, MMA device design file; 3、Design Institute submitted detailed design schedule 4、The minutes of the docking with the Design Instit

您可能关注的文档

文档评论(0)

676200 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档