- 1、本文档共64页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
13040-PI0604-010 丙烯腈项目二级计划报批-译文
Work Liaison Sheet
To: Jiangsu Sierbang Petrochemical Co., Ltd.
Fr: Wison Engineering (China) Co., Ltd. project department of Jiangsu Sierbang Petrochemical Acrylonitrile project department
Cc: Jiangsu Sierbang Petrochemical Co., Ltd. Acrylonitrile Division、Commerce Department、Product Department 、Electrical Center.、 Instrument Center
Subject: Schedule – Level II of Acrylonitrile project department for Approval
Description:
Sierbang Petrochemical alcohol Quito cogeneration project acrylonitrile project (contains AN / SAR /MMA device) Schedule – Level II discuss with the owners of each department, and abutment ,has completed the adjustment and modification of acrylonitrile project Schedule – Level II, Please give a reply!
Attach:1.acrylonitrile project Schedule – Level II illustration
2.Sierbang Petrochemical alcohol Quito cogeneration project acrylonitrile project (contains AN / SAR /MMA device) Schedule – Level II
The two stage plan of Acrylonitrile project
一、Project overview
Sierbang Petrochemical alcohol Quito cogeneration project acrylonitrile project contains 260000 tons / year AN equipment, 210000 tons / year SAR equipment, 80000 tons / year MMA device. The AN device and SAR device by Sinopec Ningbo Engineering Limited company to undertake design, AN device using Dupont patented technology package, SAR device using Chemetics patented technology; MMA device by Jilin Design Institute of China Petroleum Group Northeast Refining Chemical Engineering Limited company to undertake the design work, use the patent technology of VEKAMAF company. The project by Wison Engineering (China) Co., Ltd. for Em+PC main contractor (including import equipment procurement by the owners).
二、Planning basis
1、General contract project 1, Jiangsu Petrochemical Company Limited Sierbang alcohol based productive projects;
2、AN device, SAR device, MMA device design file;
3、Design Institute submitted detailed design schedule
4、The minutes of the docking with the Design Instit
您可能关注的文档
- [上册]我有一个梦想概要1.ppt
- [中学联盟]广东省中山市卓雅外国语学校20152016学年八年级上学期期中考试英语试题概要1.doc
- [中学联盟]安徽省滁州市第二中学高中英语选修六:U18 lesson 3 Poetry概要1.ppt
- [上册]Unit 1You are What You Think概要1.ppt
- 080323部门职能范围.doc
- [上册]Unit Five答案概要1.ppt
- [中学联盟]江苏省仪征市谢集中学2014届九年级英语:初三阅读理解复习课件概要1.ppt
- YE283支架工艺及夹具设计说明书概要1.doc
- [下册]Unit2概要1.ppt
- [中学联盟]江苏省永丰初级中学(牛津版)七年级英语下册《Unit1 Dream homes》复习课件概要1.pptx
最近下载
- 聚焦数学核心素养 让量感在课堂上有序生长——以“课桌有多长”为例-来源:理科爱好者(教育教学版)(第2022002期)-成都大学.pdf VIP
- 科学家郭永怀个人事迹(7篇).docx
- 医院培训课件:《外周血形态学检验人员能力比对考核体系的建立与应用》.pptx
- 电子商务法律法规考试试题与答案.docx
- 前期物业管理物资清单.doc
- (高清版)BT 9790-2021 金属材料 金属及其他无机覆盖层的维氏和努氏显微硬度试验.pdf VIP
- 关于深入落实电价优惠和公共资源开放加快山东省5G基站建设的通知.pdf
- 最新高中英语教学设计.doc
- 五三天天练二年级语文电子版.docx
- 中等职业学校美术绘画专业人才培养.docx
文档评论(0)