1. 1、本文档共31页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
BIM 项目

The Solution ? BIM Goes Underground As the design concept took shape, the civil engineering team began planning the site, including parking, approaches, and water and sewer connections. Tyndall Air Force Base is an older base, with a significant amount of underground infrastructure, even under the area chosen for the fitness center. “It can be a challenge to design around existing underground infrastructure, especially the fiber optic communication networks common on military installations, doing spacing calculations for every place pipes or cables cross is extremely time-consuming with 2D tools.” ------Laura Ford,(a civil engineering technician with PBSJ. ) AutoCAD Civil 3D software, Autodesk’s BIM solution for civil engineering, helped the PBSJ team to create a 3D model of the existing underground infrastructure. The Solution ? Conflict Detection As the project progressed, PBSJ held regular coordination meetings to identify and address conflicts and interferences. Before each meeting, PBSJ combined the models from the various teams with Autodesk Navisworks software. Navisworks allowed PBSJ to aggregate and review the designs for interferences 5. Evaluation “Using BIM helped our multidisciplinary teams to enhance the design together. Many times, I collaborated in real time with architects around a computer. It is not necessary to explain an idea and hope it’s clear. Everyone can visualize it by looking at the model.” ------ Srikanth Mangalampalli,(senior structural engineer with PBSJ and the structural engineer of record on the Tyndall Fitness Center project) “BIM supports government projects by helping them stick to budget and schedule,” adds Siddiqui. “As we saw on the project, BIM also makes it easier to develop and refine more energy-efficient, sustainable designs.” ------ Rashid Siddiqui,(PBSJ’s national BIM manager) Presentation 2013 Mar. 14th BIM探究小组 @中国BIM门户网

文档评论(0)

dajuhyy + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档