- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
2010年造价员考试练习题及答案(国外英文资料)
2010年造价员考试练习题及答案
A. greater than
B. is less than
C. equals
D. is 10%
2, in accordance with the relevant provisions of the Interim Measures for the management of the quality bond of construction projects in China, the following mistakes are made.
A. from the project through the method of defect liability period (AC) is calculated from the date of acceptance.
Because the cause of B. project can not be completed within the prescribed time limit (AC) acceptance, the contractor should submit the (AC) automatically enter the defect liability period acceptance report 90 days project
C. all or part of the construction projects invested by the government shall be reserved at 3% of the total settlement of the project price
During the period of D.s defects, the Contractor shall not be relieved of any responsibility for the general damages of the project after the contractor has repaired and paid the corresponding fees
3, relative to the total project investment, in the implementation process of each individual project investment deviation belongs to ()
A. absolute deviation
B. relative deviation
C. cumulative deviation
D. local deviation
4, an independent earthwork, the tender documents estimated project amount is 1 million m3, the contract agreed: the project paid monthly and at the same time the amount deduct 5% of the prepayment; earthworks full cost price 10 yuan per cubic meter, when the actual quantity exceeding the estimated output of 10%, more than part of the adjustment of price 9 yuan per cubic meter. When a construction unit completed a monthly earthwork of 250 thousand M3, the total amount of work completed by the month was 1 million 200 thousand M3, and the project should be paid (RMB) 10000 yuan this month.
A. 240
B. 237.5
C. 228
D. 213
5, known a sub project related data are as follows, the sub project investment partial deviation is () 10000 yuan.
A.110
B.-100
C.110
D.-110
6, the principle of settling the price of domestic equipment and equipment is to abide by
您可能关注的文档
- !!!变压器的要求和技术参数(国外英文资料).doc
- (上卷)重新学会笑--------中国式新森田教...(国外英文资料).doc
- (宁鸣)晨间(国外英文资料).doc
- (四)津液-(国外英文资料).doc
- (新版)高强轻质高温耐火砖生产制造制备及应用工艺专利技术文集(国外英文资料).doc
- (图解)普林斯顿进攻体系(国外英文资料).doc
- (第1章) 单片机教案(国外英文资料).doc
- (考试时间:70分钟 试卷满分:70分 考试形式:开卷)(国外英文资料).doc
- - 上海LNG加气站 上海CNG加气站博客上海LNG加气站 上海CNG加气站博客(国外英文资料).doc
- ...我相信能耐耐心心看完文章的人,不用再对手机这东西纠结了_百度文库...(国外英文资料).doc
最近下载
- “新质生产力”系列(五):聚势而飞,低空经济主题投资研究.pptx VIP
- 《GB_T 45526 - 2025北斗_全球卫星导航系统(GNSS)实时动态精密单点定位状态域改正产品规范》最新解读.pptx VIP
- 船舶定位与导航电子海图与电子海图系统1古野FMD3200电子海图使用说明书.pdf
- “新质生产力”系列(四):围绕“五篇大文章”构建投资策略.pdf VIP
- 《园林景观手绘技法表现》教案——项目4园林景观平面图表现技法.docx VIP
- 新质生产力六大主线巡礼.pdf VIP
- “新质生产力”系列(四):围绕“五篇大文章”构建投资策略.docx VIP
- “新质生产力”系列(八):八大新兴产业及九大未来产业巡礼-国信证券-202412.docx VIP
- 乳腺癌的分子分型.pptx VIP
- 新质生产力系列专题(七):科技股盈利提升之路有哪些?.docx VIP
原创力文档


文档评论(0)