- 1
- 0
- 约3.12万字
- 约 17页
- 2017-07-05 发布于河南
- 举报
变电运行资料 文本文档(国外英文资料)
变电运行资料 文本文档
Operation of substation operation standardization review data, fill in the blank title: 1, grounding wire must be dedicated (wire clip) fixed on the conductor, winding method is strictly prohibited for grounding or short circuit. 2, in the (accident handling) process, you can not fill in the operation of the switch, but must be recorded on the duty record. 3, the work should be completed (second kinds of work tickets) on the two circuit without the need to cut off the high-voltage equipment. The impedance voltage difference between 4 and two transformers is not more than (10%). When the other conditions meet the requirements, the two transformers can be juxtaposed. 5. When the accident is being dealt with, (to rescue the electric shock personnel), extinguish the fire and rescue the emergency equipment, the attendant has the right to deal with it first, and then report it to the dispatcher. 6, the battery is strictly prohibited in operation and maintenance (short circuit). 7. Transformer zero sequence protection is the backup protection of (line). The high voltage side fuse of the 8 and 10KV voltage transformers may cause protection misoperation. Therefore, we should first disable (protection), and then deal with. 9. When the standby time reaches (3 months) and above, the AC voltage withstand test and the insulation resistance test must be done before the cold standby circuit breaker cabinet is ready. 10. The capacitor bank is disabled for more than half a year and must be tested before re entering. 11, a valve type arrester is installed at the neutral point of the transformer to protect against lightning stroke. The differential protection action of the 12 main transformer shows that the main transformer (internal) is out of order. 13. The wiring group of the transformer indicates the phase relation between the high and low voltage (line voltage) of the transformer. 14. The temperature in the battery room shall not exceed 35 centigrade. 15, 10KV, 35KV, 1
您可能关注的文档
- 《小学语文知识大全》 之一:生活常识(国外英文资料).doc
- 《安全员专业基础知识》考试大纲(国外英文资料).doc
- 《幻世录Ⅱ》 物品代码(国外英文资料).doc
- “万能八条”详解 )(国外英文资料).doc
- 《导游服务技能》模拟答案(国外英文资料).doc
- 《建设法规》复习题(国外英文资料).doc
- 《工程建设监理概论》心得(国外英文资料).doc
- 《强身祛疲》口服液概论(国外英文资料).doc
- 《必修2》知识点汇编(国外英文资料).doc
- 《建筑材料》教学大纲doc(国外英文资料).doc
- 江苏省南京市第二十九中学2025-2026学年高三上学期10月月考数学试题.docx
- 黑龙江省哈尔滨市第九中学校2025-2026学年高二上学期11月期中考试数学试题.docx
- 湖北省黄石市2026届高三上学期9月起点考试数学试题.docx
- 安徽省部分学校2025-2026学年高三上学期10月联考数学试卷.docx
- 湖南省湘潭县第一中学2025-2026学年高二上学期期中考试数学试题.docx
- 班会青春梦想起航远航.pptx
- 统编版语文三年级下册《语文园地六》课件.pptx
- 2025年地产项目投资合作框架合同样本.docx
- 2025年中美合作焊接技术员合同录用协议.docx
- 江苏省无锡市第一中学2025-2026学年高三上学期12月9日数学周测.docx
最近下载
- 2026年福建长泰国有投资集团有限公司及权属子公司招聘5人备考考试题库及答案解析.docx VIP
- 2026年福建长泰国有投资集团有限公司及权属子公司招聘5人考试参考题库附答案解析.docx VIP
- 2024年漳州市长泰区国有企业招聘真题.docx VIP
- 2026福建长泰国有投资集团有限公司及权属子公司正式员工招聘5人备考考试试题及答案解析.docx VIP
- 复合铜箔生产基地、薄膜金属化研发试验中心项目报告表.pdf VIP
- 小嘀人脸识别智能锁R5-产品说明书.pdf
- 2026年福建长泰国有投资集团有限公司及权属子公司招聘5人笔试备考试题附答案解析.docx VIP
- 2026福建长泰国有投资集团有限公司及权属子公司正式员工招聘5人备考考试题库及答案解析.docx VIP
- 小学语文一到六年级带注音生字表(人教版).doc VIP
- 2025年漳州市国企考试真题.docx VIP
原创力文档

文档评论(0)