- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
安装计算(国外英文资料)
安装计算
To get the drawings, first check whether the drawings are complete, complete, in the next step,
Symbol recognition: all unlabeled figures except the elevation are m, and the rest are mm. (Schedule 1) all horizontal pipes that come in from the outside are called dry pipes. The ones that stand up from the dry pipes are called risers, and the ones that come out of the risers are called laterals. Make sure that the scale on the map is correct
(1) Electrical Engineering (including high voltage parts, weak current parts and lightning protection earthing parts);
First, strong electricity part:
1, familiar with the drawings: look at the design specifications, the design specifications on the engineering materials and parts of the lightning all down, then it is generally a legend, the legend of all need a number (the distribution box with different specifications, lamps, sockets, switches etc.) are respectively. The statistics of the number; see diagram to deal with the system plan, to understand the. System diagram on the general direction in the plane or circle (that only vertical go); about the direction of the system in plan; system diagram on the diagonal 45 degrees direction, in the pipeline plan to go around; push the vertical height map system tube with the elevation of the plane map can measure trunk and branch length of horizontal section;
2, engineering calculation process: first of all, from the outdoor to the main distribution box, the distribution box, the indoor distribution box and the circuit (lighting, socket, etc.).
3, the calculation procedure: first calculate the pipe (slot), then calculate the line (cable), the pipe (slot) does not enter the box, line (cable) into the box.
4, the relevant provisions: outdoor line drawings on unlabeled instances, outdoor reserved 1.5m (outdoor to exterior skin); cable into the box length 2m, length of wire into the semi perimeter box distribution box; not to practice, considering the practice ground for 0.3m. The wi
原创力文档


文档评论(0)