- 1、本文档共12页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
03建筑设计标准规范(外国英文资料)
03建筑设计标准规范
Site and architectural design (level two) lecture class third lecture courseware (Global vocational education online)
Site and architectural design (level two) lecture class third lecture notes
Design of residential shared parts (Continued)
(two) corridor and population;
1. safety design gallery, patio and roof railing at the airport with a balcony railing.
2. as the main channel of the veranda veranda and should be made into a closed, open the window. The corridor width should not be less than 1.2m.
3. of the public residential entrance is located in the balcony, veranda and open staircase in the lower part of the platform, should be taken to set the rain cover etc. safety measures to prevent falling objects wounding.
4. of the public residential entrance should have the identification mark; Xinbaoxiang can be set by households. High-rise residential public entrance hall, room management should be set up and the room.
5., set up the elevator residential public entrances and exits, when there is a difference between indoor and outdoor, wheelchair ramps and handrails should be provided.
(three) garbage collection facilities;
1., the residential should not install garbage pipe. When there is no garbage pipe, multi-storey residential buildings should be set up according to the way of garbage collection; the middle and top floors should be equipped with enclosed garbage collection rooms.
2., the garbage pipe, the garbage pipe shall not be adjacent to the bedroom, living room layout. Minimum cross-section of the garbage pipe: multi-storey residential 0.4m square; medium and high-rise residential 0.5m square; high-rise residential 0.6m square. Garbage bucket and garbage Doumen should be corrosion resistant and close tightly. The top of the waste pipe should be exposed to the roof, and the bottom should be enclosed with garbage.
(four) basement and semi basement
1. the house should not be laid in the basement. When located in a semi basement, measures must be t
您可能关注的文档
- 001人工挖土施工工艺(外国英文资料).doc
- .NET分层结构(外国英文资料).doc
- 010 C语言的编程格式(外国英文资料).doc
- 0-模拟电子技术基础课绪论(外国英文资料).doc
- (新课标)现代文阅读答题模式详解(外国英文资料).doc
- --华安盛道管理网 如何在单件装配企业推行精益生产(外国英文资料).doc
- 04相关模拟(外国英文资料).doc
- 05二注构造与电气真题(外国英文资料).doc
- 08-09乒乓球初级试卷---复习卷D(外国英文资料).doc
- 08-09电路试卷A答案(外国英文资料).doc
- 职业技术学院2024级工业机器人技术(安装与维护)专业人才培养方案.docx
- 职业技术学院2024级应用化工技术专业人才培养方案.pdf
- 职业技术学院2024级软件技术(前端开发)专业人才培养方案.pdf
- 职业技术学院2024软件技术专业人才培养方案.docx
- 职业技术学院2024级信息安全技术应用(安全运维)专业人才培养方案.docx
- 职业技术学院2024级新能源汽车检测与维修技术(车辆鉴定与评估)专业人才培养方案.pdf
- 职业技术学院2024级石油炼制技术专业人才培养方案.pdf
- 职业技术学院2024级环境监测技术专业人才培养方案.docx
- 职业技术学院2024级汽车制造与试验技术专业人才培养方案.pdf
- 职业技术学院2024级信息安全技术应用专业人才培养方案.pdf
文档评论(0)