- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
冬施(国外英文资料)
冬施
Winter construction plan
In order to ensure the smooth implementation of winter construction, since the beginning of the eve of winter construction, set up a project manager for the first responsibility of the construction site of winter construction leading group, to make the necessary preparatory work for winter construction plan.
First, the principle of construction to ensure the quality of the project; economic and reasonable; increase the cost of the least; the required heat sources and materials have a reliable source, and minimize energy consumption; can really shorten the time limit.
Two, construction preparation, when the temperature is lower than 0 degrees, should adopt winter construction measures, in order to prevent construction project suffer frost damage.
The approximate time of taking winter measures is determined according to the temperature data of Xian over the years, according to the daily average temperature of continuous 5D and the stability below 5 celsius.
(I) organizational measures
1, the establishment of winter construction leading group leader:
Deputy team leader:
Team member:
2, into the winter period before the construction of admixture of personnel, personnel, management personnel of furnace temperature insulation, specially organized technical training, learn about the knowledge of the work within the scope of clear responsibilities, after passing the examination, must work.
3, send people to listen to the weather forecast in time to prevent sudden cold attack.
4, test personnel during the construction of the outdoor air temperature measurement, the temperature in the greenhouses, mortar, concrete temperature and record.
(two) the preparation of drawings for any winter construction project, will review the construction drawings, check whether it can meet the winter construction requirements. Such as the wall thickness ratio, horizontal wall spacing and other structural stability, as well as the engineering structure in the cold sta
文档评论(0)