- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
包墙安装施工技术措施(国外英文资料)
包墙安装施工技术措施
Author: Huangfu article source: personal clicks: 3332 update time: 2006-6-20 20:40:50
Technical measures for combined installation of 1# clad wall superheater
1. General situation of Engineering
1.1 project introduction
XXXXXX (2 * 135MW) boiler model is: DG480/13.7- II 10, produced by XX boiler (Group) Limited by Share Ltd. Ultra high pressure, natural circulation, the four corners of the combustion, a reheat, balanced ventilation, solidslag, closed tight, full steel structure, full suspension structure, rotary air preheater, single furnace shape layout, coal-fired drum boiler.
The composition and engineering quantity of 1.2 pack wall superheater
The package wall superheater consists of the rear shaft, the front wall, the left (right) side wall superheater, the rear shaft, the back wall, the middle wall, the ceiling superheater, the horizontal flue and the bottom wall.
Package wall superheater and rigid beam weight total: 94141 kg, in which pipe screen 57013 kg, union box 21262kg, rigid beam 15866kg.
2. Compilation basis:
Professional construction organization design of boiler of 1# unit project 2.1 Xinzhou Guangyu power plant
2.2 relevant drawings of Dongfang Boiler Factory and boiler installation instruction
2.3 thermal power construction quality inspection and evaluation standard 1996-10
2.4 technical specification for construction and acceptance of electric power construction (boiler unit section) DL/T 5047-95
2.5 safety work regulations for power construction DL5009.1-2002
3 、 construction preparation:
3.1 job qualification requirements
3.1.1 all operators are required to pass the safety examination and physical examination, and qualified.
3.1.2 before starting, should be familiar with design and equipment drawings, understand technical disclosure content, clear drawings of construction symbols, process requirements and technical requirements.
3.1.3 construction personnel should have strong safety and quality awareness, and actively cooperate with q