- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
安全制度汇编(第一本)5(国外英文资料)
安全制度汇编(第一本)5
The fifth part is production scheduling management system
Measures for operation of production scheduling
I. General provisions:
1, according to the dispatch room work to complete enough scheduling business personnel, equipped with telephone, fax machines and other necessary equipment, responsible for the mine safety production dispatching work.
2, dispatching staff must be familiar with the mine management system and dispatch room management system, the post responsibility system. Be familiar with underground production system, power supply system, ventilation system, route of avoiding disaster, ensure safety production, scientific command and standard operation.
3, the dispatch room 24 hour duty system. Strengthen leadership at all levels of duty, apply for listing posts, and stick to the post of full authority to deal with the day of safety production.
4, the dispatch room and mine, underground production area, the workplace must maintain a smooth flow of communications and scheduling information timely and accurately, and to the situation, Xiaqing upload.
Two 、 routine work of control room:
1, the dispatch office uses the telephone to report, each kind of data and the report form promptly sends the facsimile report to the Bureau, the dispatch room, the prompt or the untimely contact way carries on the daily service and the safe production information dispatch.
2, dispatchers should stick to their posts, conscientiously perform their duties, do a good job on duty records, handle all kinds of accidents and major accidents on duty, and report to the leaders on duty in a timely manner.
3, the dispatcher must be timely handover, handover time every day at 8:30 in the morning shift as follows: completion of coal production, the day of mine excavation. The underground production dynamic production team. The problems left over in the production of this class and the problems not dealt with. Progress of important projects and special projects. Implementation
您可能关注的文档
最近下载
- 人教版四年级上册数学培优辅差计划.pdf VIP
- 比较思想政治教育(第二版) 001 比较思想政治教育(第二版) 第一章.pptx VIP
- 《声学基础》课件 .ppt VIP
- 2024-2025学年上海市陆行中学高二上学期9月月考数学试卷含详解.docx VIP
- 学校食堂从业人员培训资料全.pptx VIP
- 比较思想政治教育(第二版) 010 比较思想政治教育(第二版) 第十章.pptx VIP
- 2024版新教材九年级化学上册知识清单(教师版).pdf VIP
- 湖南省岳阳市临湘市第六中学2023-2024学年七年级上学期开学考试 数学试题.docx VIP
- 《计算机应用基础(第6版)Windows11+WPS Office》全套教学课件.pptx
- 比较思想政治教育(第二版) 013 比较思想政治教育(第二版) 第十三章.pptx VIP
文档评论(0)