CDM项目核查与认证 CDM Project Verification and Certification CDM项目流程:The CDM Project Cycle 核查:Verification 核查是指由指定的经营实体定期独立审评和事后确定已登记的CDM 项目活动在核实期内产生的、经监测的温室气体(GHG)源人为减排量。核实期的期限长短尚没有规定。但是, 核查期不得长于计入期。 Verification is the periodic independent review and ex post determination by a designated operational entity of monitored reductions in anthropogenic emissions by sources of greenhouse gases (GHG) that have occurred as a result of a registered CDM project activity during the verification period. There is no prescribed length of the verification period. It shall, however, not be longer than the credi